Refine your search:     
Report No.
 - 

Waste management scenario in the hot cell and waste storage for DEMO

Someya, Yoji; Tobita, Kenji; Yanagihara, Satoshi*; Kondo, Masatoshi*; Uto, Hiroyasu; Asakura, Nobuyuki; Hoshino, Kazuo; Nakamura, Makoto; Sakamoto, Yoshiteru

In the replacement period of a fusion power reactor, the assembly of blanket or divertor modules need to be removed from the reactor in order to minimize remote maintenance in the vacuum vessel and to attain a reasonable plant availability. In the hot cell, the modules will be removed from the backplate of the assembly. Here, note that the active cooling must be done by a way that does not cause contamination of the hot cell environment due to dispersion of tritium and tungsten dust. In this sense, the cooling scenario is adopted that the existing pipe of cooling water in the assembly is connected to a different cooling water system in the hot cell. In this scenario, the temperature of the assembly is maintained about 40-100$$^{circ}$$C. On the other hand, the structural material (RAFM) of the blanket and divertor is not recycled due to its high contact dose rate. It should be crushed into small pieces to reduce volume of the waste and required storage space. Here, the decay heat must be removed by natural convection to keep the temperature below 65$$^{circ}$$C for preventing water evaporation from the mortar. The RAFM is kept in the interim storage during 12 years until the required temperature conditions for mortar are ensured and then is disposed of.

Accesses

:

- Accesses

InCites™

:

Percentile:57.01

Category:Nuclear Science & Technology

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.