Refine your search:     
Report No.
 - 
Search Results: Records 1-9 displayed on this page of 9
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Stepwise renewal of JRR-3 process control computer system

Isaka, Koji; Suwa, Masayuki; Kimura, Kazuya; Suzuki, Makoto; Ikekame, Yoshinori; Nagadomi, Hideki

JAEA-Technology 2021-039, 48 Pages, 2023/02

JAEA-Technology-2021-039.pdf:6.97MB

JRR-3 Process control system is used from the initial criticality (1990) after remodeling JRR- 3 as equipment used for monitoring and control of flow rate, temperature, pressure, water level, etc. of coolant and operation of nuclear reactor equipment, and it became necessary to renew as the aging progressed and spare parts could not be obtained sufficiently. Upon renewal, from the viewpoint of ensuring conservation of the core such as decay heat removal and minimizing the impact on reactor users and minimizing costs, it is important not to stop long-term reactor shutdown we planned to divide it into three stages and make it on a continuous basis. This report summarizes the renewal plan and renewal work divided into three stages.

JAEA Reports

Interim activity status report of "the group for investigation of reasonable safety assurance based on graded approach" (from September, 2019 to September, 2020)

Yonomoto, Taisuke; Nakashima, Hiroshi*; Sono, Hiroki; Kishimoto, Katsumi; Izawa, Kazuhiko; Kinase, Masami; Osa, Akihiko; Ogawa, Kazuhiko; Horiguchi, Hironori; Inoi, Hiroyuki; et al.

JAEA-Review 2020-056, 51 Pages, 2021/03

JAEA-Review-2020-056.pdf:3.26MB

A group named as "The group for investigation of reasonable safety assurance based on graded approach", which consists of about 10 staffs from Sector of Nuclear Science Research, Safety and Nuclear Security Administration Department, departments for management of nuclear facility, Sector of Nuclear Safety Research and Emergency Preparedness, aims to realize effective graded approach (GA) about management of facilities and regulatory compliance of JAEA. The group started its activities in September, 2019 and has had discussions through 10 meetings and email communications. In the meetings, basic ideas of GA, status of compliance with new regulatory standards at each facility, new inspection system, etc were discussed, while individual investigation at each facility were shared among the members. This report is compiled with expectation that it will help promote rational and effective safety management based on GA by sharing contents of the activity widely inside and outside JAEA.

JAEA Reports

Renewal of JRR-3 process control computer system

Suwa, Masayuki; Isaka, Koji; Ouchi, Satoshi; Goto, Shingo; Ikekame, Yoshinori; Terakado, Yoshibumi

JAEA-Technology 2011-041, 35 Pages, 2012/03

JAEA-Technology-2011-041.pdf:7.11MB

JRR-3 process control computer system is used to monitor and control various process parameters such as flow rates, temperatures, pressures and so on, and operate many reactor components such as cooling pumps and valves. The system has been under aging degradation at this time and the renewal of the system has become indispensable. The renewal work has planned, paying a due consideration to minimizing renewal costs and duration, to be separated in three stages. This paper describes the renewal plan and renewal works of main part of the system.

JAEA Reports

Development of the JRR-3 data processing computer system

Ouchi, Satoshi; Suwa, Masayuki; Isaka, Koji; Ikekame, Yoshinori; Terakado, Yoshibumi

JAEA-Testing 2011-006, 43 Pages, 2012/02

JAEA-Testing-2011-006.pdf:2.9MB

JRR-3 has been utilized for various researches such as neutron irradiation experiment, neutron beam experiment and so on as a high performance research reactor with thermal power of 20 MW since the first criticality in March, 1990. Process data needed for JRR-3 operation such as temperatures, pressures, and flow rates, etc. had been processed by JRR-3 process computer system which consisted of several computer systems and several application softwares. The system needed complicated data administration and conservation. Also there was a problem in the administration of recording data. Data discrepancy among computers used in the system was taken place since the system was not so designed as to synchronize the process timing among the computers. Therefore, we developed a program to synchronize among all of the computers. This paper reports the development of data processing computer system.

Journal Articles

Maintenance activities of instrumentation control device at JRR-3

Isaka, Koji; Terunuma, Noriaki; Ouchi, Satoshi; Oki, Keiichi; Suwa, Masayuki

Nihon Hozen Gakkai Dai-6-Kai Gakujutsu Koenkai Yoshishu, p.279 - 282, 2009/08

As the modified JRR-3 has been operated for 18 years, it is necessary to be maintained for keeping the safe and stable operation. The review of maintenance activity is constantly performed for the step-by-step update of facilities and the improvement of the maintenance method and so on. Our investigation of the maintenance activity about the instrumentation and control device of modified JRR-3 is presented.

Journal Articles

Renewal of JRR-3 process computer system

Suwa, Masayuki; Isaka, Koji; Ouchi, Satoshi; Terunuma, Noriaki

UTNL-R-0471, p.12_1_1 - 12_1_8, 2009/03

no abstracts in English

JAEA Reports

Loop accuracy of JRR-3 safety protection system

Ikekame, Yoshinori; Ouchi, Satoshi; Suwa, Masayuki; Isaka, Koji; Goto, Shingo; Murayama, Yoji

JAEA-Technology 2007-052, 47 Pages, 2007/08

JAEA-Technology-2007-052.pdf:11.94MB

In order to sustain safe and stable operation of JRR-3, it is necessary to measure and indicate appropriately the process values such as flow rate of coolant with the process instrumentation facilities of JRR-3. Whenever reactor facilities such as cooling pump or measuring device are maintained or refurbished, the process instrumentation facilities are calibrated with the appropriate criteria established by considering overall accuracy of the facilities. In this report, for all of the safety protection system, a part of the process instrumentation facilities, accuracy of each component and overall accuracy of the system are compiled. Using these date, the process instrumentation facilities would be maintained more effectively and objectively.

Oral presentation

The Renewal plan of JRR-3 process control system

Nio, Daisuke; Ikekame, Yoshinori; Suwa, Masayuki; Isaka, Koji; Ouchi, Satoshi; Mineshima, Hiromi; Motohashi, Jun; Torii, Yoshiya; Kinase, Masami; Murayama, Yoji

no journal, , 

no abstracts in English

Oral presentation

Current status and plant management in JRR-3

Suwa, Masayuki; Terunuma, Noriaki; Isaka, Koji; Ouchi, Satoshi; Ikekame, Yoshinori

no journal, , 

no abstracts in English

9 (Records 1-9 displayed on this page)
  • 1