Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Suwa, Masayuki; Isaka, Koji; Ouchi, Satoshi; Goto, Shingo; Ikekame, Yoshinori; Terakado, Yoshibumi
JAEA-Technology 2011-041, 35 Pages, 2012/03
JRR-3 process control computer system is used to monitor and control various process parameters such as flow rates, temperatures, pressures and so on, and operate many reactor components such as cooling pumps and valves. The system has been under aging degradation at this time and the renewal of the system has become indispensable. The renewal work has planned, paying a due consideration to minimizing renewal costs and duration, to be separated in three stages. This paper describes the renewal plan and renewal works of main part of the system.
Fukushima, Manabu; Owada, Minoru; Ota, Kazunori; Takeuchi, Masaki; Goto, Shingo; Imahashi, Masaki; Terakado, Yoshibumi
JAEA-Technology 2010-028, 24 Pages, 2010/09
The cooling tower of the JRR-3's secondary cooling system is used to emit the heat from the core into the atmosphere. The appropriate maintenance of the cooling tower has helped the safe and stable reactor operation. Temperature of the secondary coolant had controlled constantly by changing the number of cooling fans. But, just after the number of fans changed, the temperature changed transiently and consequently the reactor thermal power changed. In order to amend this some weakness, the control system has improved to change the speed of fans constantly. The maintenance and improvement activities with the records of inspection are compiled to be utilized for future work.
Ikekame, Yoshinori; Ouchi, Satoshi; Suwa, Masayuki; Isaka, Koji; Goto, Shingo; Murayama, Yoji
JAEA-Technology 2007-052, 47 Pages, 2007/08
In order to sustain safe and stable operation of JRR-3, it is necessary to measure and indicate appropriately the process values such as flow rate of coolant with the process instrumentation facilities of JRR-3. Whenever reactor facilities such as cooling pump or measuring device are maintained or refurbished, the process instrumentation facilities are calibrated with the appropriate criteria established by considering overall accuracy of the facilities. In this report, for all of the safety protection system, a part of the process instrumentation facilities, accuracy of each component and overall accuracy of the system are compiled. Using these date, the process instrumentation facilities would be maintained more effectively and objectively.
Kato, Yoshinari; Hashimoto, Makoto; Miyauchi, Hideaki; Yasumune, Takashi; Ogawa, Ryuichiro; Goto, Shingo; Ochiai, Yukihiro*; Matsui, Junki
no journal, ,
no abstracts in English