Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Isaka, Koji; Suwa, Masayuki; Kimura, Kazuya; Suzuki, Makoto; Ikekame, Yoshinori; Nagadomi, Hideki
JAEA-Technology 2021-039, 48 Pages, 2023/02
JRR-3 Process control system is used from the initial criticality (1990) after remodeling JRR- 3 as equipment used for monitoring and control of flow rate, temperature, pressure, water level, etc. of coolant and operation of nuclear reactor equipment, and it became necessary to renew as the aging progressed and spare parts could not be obtained sufficiently. Upon renewal, from the viewpoint of ensuring conservation of the core such as decay heat removal and minimizing the impact on reactor users and minimizing costs, it is important not to stop long-term reactor shutdown we planned to divide it into three stages and make it on a continuous basis. This report summarizes the renewal plan and renewal work divided into three stages.
Suwa, Masayuki; Isaka, Koji; Ouchi, Satoshi; Goto, Shingo; Ikekame, Yoshinori; Terakado, Yoshibumi
JAEA-Technology 2011-041, 35 Pages, 2012/03
JRR-3 process control computer system is used to monitor and control various process parameters such as flow rates, temperatures, pressures and so on, and operate many reactor components such as cooling pumps and valves. The system has been under aging degradation at this time and the renewal of the system has become indispensable. The renewal work has planned, paying a due consideration to minimizing renewal costs and duration, to be separated in three stages. This paper describes the renewal plan and renewal works of main part of the system.
Ouchi, Satoshi; Suwa, Masayuki; Isaka, Koji; Ikekame, Yoshinori; Terakado, Yoshibumi
JAEA-Testing 2011-006, 43 Pages, 2012/02
JRR-3 has been utilized for various researches such as neutron irradiation experiment, neutron beam experiment and so on as a high performance research reactor with thermal power of 20 MW since the first criticality in March, 1990. Process data needed for JRR-3 operation such as temperatures, pressures, and flow rates, etc. had been processed by JRR-3 process computer system which consisted of several computer systems and several application softwares. The system needed complicated data administration and conservation. Also there was a problem in the administration of recording data. Data discrepancy among computers used in the system was taken place since the system was not so designed as to synchronize the process timing among the computers. Therefore, we developed a program to synchronize among all of the computers. This paper reports the development of data processing computer system.
Ichimura, Toshiyuki; Suwa, Masayuki; Fukushima, Manabu; Oba, Toshinobu; Nemoto, Yoshinori; Terakado, Yoshibumi
Proceedings of 12th International Group on Research Reactors (12th IGORR) (USB Flash Drive), 8 Pages, 2009/10
Isaka, Koji; Terunuma, Noriaki; Ouchi, Satoshi; Oki, Keiichi; Suwa, Masayuki
Nihon Hozen Gakkai Dai-6-Kai Gakujutsu Koenkai Yoshishu, p.279 - 282, 2009/08
As the modified JRR-3 has been operated for 18 years, it is necessary to be maintained for keeping the safe and stable operation. The review of maintenance activity is constantly performed for the step-by-step update of facilities and the improvement of the maintenance method and so on. Our investigation of the maintenance activity about the instrumentation and control device of modified JRR-3 is presented.
Suwa, Masayuki; Isaka, Koji; Ouchi, Satoshi; Terunuma, Noriaki
UTNL-R-0471, p.12_1_1 - 12_1_8, 2009/03
no abstracts in English
Ikekame, Yoshinori; Ouchi, Satoshi; Suwa, Masayuki; Isaka, Koji; Goto, Shingo; Murayama, Yoji
JAEA-Technology 2007-052, 47 Pages, 2007/08
In order to sustain safe and stable operation of JRR-3, it is necessary to measure and indicate appropriately the process values such as flow rate of coolant with the process instrumentation facilities of JRR-3. Whenever reactor facilities such as cooling pump or measuring device are maintained or refurbished, the process instrumentation facilities are calibrated with the appropriate criteria established by considering overall accuracy of the facilities. In this report, for all of the safety protection system, a part of the process instrumentation facilities, accuracy of each component and overall accuracy of the system are compiled. Using these date, the process instrumentation facilities would be maintained more effectively and objectively.
Nio, Daisuke; Ikekame, Yoshinori; Suwa, Masayuki; Isaka, Koji; Ouchi, Satoshi; Mineshima, Hiromi; Motohashi, Jun; Torii, Yoshiya; Kinase, Masami; Murayama, Yoji
no journal, ,
no abstracts in English
Suwa, Masayuki; Terunuma, Noriaki; Isaka, Koji; Ouchi, Satoshi; Ikekame, Yoshinori
no journal, ,
no abstracts in English
Suwa, Masayuki; Fukushima, Manabu; Terunuma, Noriaki; Ota, Kazunori; Murayama, Yoji
no journal, ,
no abstracts in English
Matsui, Yutaka; Suwa, Masayuki; Wada, Shigeru
no journal, ,
no abstracts in English