Refine your search:     
Report No.
 - 

Present status of JRR-2 decommissioning

Nakano, Masahiro; Okawa, Hiroshi; Suzuki, Takeshi; Kishimoto, Katsumi ; Terunuma, Akihiro; Yano, Masaaki

Japan Research Reactor No.2(JRR-2), heavy water moderated and cooled tank type research reactor with maximum thermal power of 10MW,was operated for over 36 years, and was permanently shut down in December, 1996. In 1997, decommissioning plan was submitted to the STA, and dismantling was begun. Decommissioning program of JRR-2 is divided into 4 phases. Phase 1, 2 had already been completely finished without any trouble. Furthermore, the phase 3 was also finished in February, 2004 as planned. On exposure of worker in phase 1, 2 and 3, it was achieved to control lower than the estimate. On exposure of worker in phase 1, 2 and 3, it was achieved to control lower than the estimate. Reactor will be removed in phase 4 by one piece removal technique. The reactor building is planned to use effectively as a hot experimental facilities after decommissioning. The decommissioning plan was changed that the reactor would be kept in safety storage.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.