Refine your search:     
Report No.
 - 

Systematic calibration of beam position monitor at J-PARC LINAC

Sato, Susumu  ; Tomisawa, Tetsuo ; Hiroki, Fumio ; Lee, S.*; Igarashi, Zenei*; Ikegami, Masanori*; Ueno, Akira  ; Kondo, Yasuhiro   ; Hasegawa, Kazuo; Toyama, Takeshi*; Kishiro, Junichi; Kamikubota, Norihiko*; Takagi, Makoto*; Tanaka, Mikio*; Akikawa, Hisashi; Sakaki, Hironao; Yoshikawa, Hiroshi

As a joint project of KEK and JAERI, a MW class of high intensity proton accelerator (J-PARC), consisting of Linac, 3 GeV-RCS, 50 GeV-MR, is under construction. For this accelerator, it is required to minimize the beam loss (typically, lower than0.1$$sim$$1 W/m at the linac). To achieve the requirement, beam trajectory needs to be controlled with accuracy of some 100 $$mu$$m. The first stage of the acceleration (up to 181 MeV during the first stage of construction) is done by linac. The beam position monitor (BPM) in the linac utilizes 4 stripline pickups (50 ohm) on the beam transportation chamber. In this paper, systematic calibration of the BPM is described.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.