Reinstallation of MP system for MIU-2 and MIU-3

Hosoda, Hiroshi*; Shimoyama, Masahiro*; Takemura, Shogo*

MIU-2 and MIU-3 were drilled in Shobasama site as a part of MIU project to characterize the hydrogeology in the deep underground. MP system had been installed in the both boreholes for long-term monitoring, but the monitoring system in MIU-2 was temporary retrieved from the boreholes to conduct the other test and the monitoring was quitted in MIU-3 because of trouble of the probe. In this project, MP system was reinstalled in MIU-2 and the probe strings of MP system were reinstalled in MIU-3 successfully. From the results, it was possible to start the long-term monitoring in MIU-2 and MIU-3.