Refine your search�ソスF     
Report No.
 - 

Irradiation tests report of the 33rd cycle in "JOYO"

not registered

This report summarizes the operating and irradiation data of the experimental reactor "JOYO" 33rd cycle, and estimates the 34th cycle irradiation condition. Irradiation tests in the 33rd cycle are as follows: (1)B-type irradiation rig (B9) (a)High burn up performance tests of "MONJU" fuel pins, advanced austenitic steel cladding fuel pins, large diameter fuel pins, ferrite steel cladding fuel pins and large diameter annular pellet fuel pins (b)Mixed carbide and nitride fuel pins irradiation tests (in collaboration with JAERI) (2)C-type irradiation rig (C4F) (a)High burn up performance test of advanced austenitic stainless steel cladding fuel pins (in collaboration with France) (3)C-type irradiation rig (C6D) (a)Large diameter fuel pins irradiation tests (4)Absorber Materials Irradiation Rig (AMIR-6) (a)Run to absorber pin's cladding breach (5)Core Materials Irradiation Rig (CMIR-5) (a)Cladding tube materials irradiation tests for "MONJU" (6)Core Materials Irradiation Rig (CMIR-5-1) (a)Core materials irradiation tests (7)Structure Materials Irradiation Rigs(SMIR) (a)Material irradiation tests (in collaboration with universities) (b)Surveillance back up tests for "MONJU" (8)Upper core structure Irradiation Plug Rig (UPR-1-5) (a)Upper core neutron spectrum effect and accelerated irradiation effect. The maximum burnup driver assembly "PFD516" reached 64,300MWd/t (pin average).

Acecsses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.