Refine your search:     
Report No.
 - 

Performance of J-PARC LINAC RF system

Kobayashi, Tetsuya; Chishiro, Etsuji; Hori, Toshihiko; Suzuki, Hiroyuki; Yamazaki, Masayoshi; Anami, Shozo*; Fang, Z.*; Fukui, Yuji*; Kawamura, Masato*; Michizono, Shinichiro*; Yamaguchi, Seiya*

High power operation of all the RF systems of J-PARC linac was started for the cavity conditioning in October 2006. Twenty 324-MHz klystrons have supplied the power to the accelerating cavities successfully. The beam commissioning was started in November 2006 then the acceleration to the design energy of 181 MeV was succeeded. The injection to the 3-GeV synchrotron will be started in September 2007. The RF control systems are performing according to the expectation, and the required field stability is satisfied.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.