Recent R&D activities of negative-ion-based ion source for JT-60SA
Ikeda, Yoshitaka; Hanada, Masaya; Kamada, Masaki; Kobayashi, Kaoru; Umeda, Naotaka; Akino, Noboru; Ebisawa, Noboru; Inoue, Takashi; Honda, Atsushi; Kawai, Mikito; Kazawa, Minoru; Kikuchi, Katsumi; Komata, Masao; Mogaki, Kazuhiko; Noto, Katsuya; Oasa, Kazumi; Oshima, Katsumi; Sasaki, Shunichi; Shimizu, Tatsuo; Takenouchi, Tadashi; Tanai, Yutaka; Usui, Katsutomi; Watanabe, Kazuhiro; Grisham, L. R.*; Kobayashi, Shinichi*; Yamano, Yasushi*; Takahashi, Masahiro*
The JT-60SA N-NBI system is required to inject 10 MW for 100 s at 500 keV. Three key issues should be solved for the JT-60SA N-NBI ion source. One is to improve the voltage holding capability. Recent R&D tests suggested that the accelerator with a large area of grids may need a high margin in the design of electric field and a long time for conditioning. The second issue is to reduce the grid power loading. It was found that some beamlets were strongly deflected due to beamlet-beamlet interaction and strike on the grounded grid. The grids are to be designed by taking account of beamlet-beamlet interaction in three-dimensional simulation. Third is to maintain the D- production for 100 s. A simple cooling structure is proposed for the active cooled plasma grid, where a key is the temperature gradient on the plasma grid for uniform D- production. The modified N-NBI ion source will start on JT-60SA in 2015.