Refine your search:     
Report No.
 - 

Settlement of materials and life science experimental facility at J-PARC

Harada, Masahide   ; Meigo, Shinichiro   ; Ito, Manabu; Dantsuji, Eiji; Takagiwa, Katsunori; Takada, Hiroshi   ; Maekawa, Fujio  ; Futakawa, Masatoshi  ; Nakamura, Mitsutaka   ; Miyake, Yasuhiro*; Ikeda, Yujiro

In MLF of J-PARC, since weights of a building and shields are considerably heavy as 130,000 tons and 80,000 tons, respectively, large settlement of the MLF building is expected. The 3NBT line with 300 m in length is similar. To achieve a precise alignment under the large settlement, we conducted periodical survey measurements at the MLF building and 3NBT. At the completion of construction of the MLF building in December 2005, the settlement was about 40 mm. By extrapolating this result with weights to be added in the future for neutron beam line shields, we predicted that the MLF building settled in about 68mm at the completion of all neutron instrument construction. We decided that the muon target should be installed 5 mm higher than the neutron target with expecting future uneven settlement of the MLF building. The validation in the end of 2007 indicated that the measured level difference came up to the expected value.

Accesses

:

- Accesses

InCites™

:

Percentile:28.22

Category:Instruments & Instrumentation

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.