Refine your search:     
Report No.
 - 

Beam instrumentations for the J-PARC RCS commissioning

Hayashi, Naoki  ; Hiroki, Seiji ; Saeki, Riuji; Toyokawa, Ryoji; Yamamoto, Kazami   ; Yoshimoto, Masahiro  ; Arakawa, Dai*; Hiramatsu, Shigenori*; Lee, S.*; Sato, Kenichiro*; Tejima, Masaki*; Toyama, Takeshi*

A 3-GeV Rapid-Cycling Synchrotron (RCS) of the Japan Proton Accelerator Research Complex (J-PARC) has been commissioned recently. During its beam commissioning, various beam diagnostic instrumentation has been used. The multi-wire profile monitor (MWPM) is used to establish injection and H0 dump line. The electron catcher confirms that the beam hits a charge exchange carbon foil and the specified current monitor limits the beam current to the H0 dump. Single pass BPMs and ionization profile monitors (IPM) help to check the one pass orbit without circulation of the beam. The beam position monitor (BPM) can measure both COD and turn-by-turn position. Tune monitor system consists of exciter and its own BPM. The exciter shakes the beam and coherent oscillation. Dedicated BPMs, Fast CT (FCT) and Wall Current Monitor (WCM) are used for RF feedback or feedfoward control. It will describe the performance of each instruments and how they are contributed to the successful beam commissioning.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.