Refine your search:     
Report No.
 - 

Studies on engineering technologies in the Mizunami Underground Research Laboratory; FY2007 (Contract research)

Noda, Masaru*; Suyama, Yasuhiro*; Nobuto, Jun*; Ijiri, Yuji*; Mikake, Shinichiro ; Matsui, Hiroya 

In construction phase in MIU, the study on engineering technology consist of following four subjects, which are Demonstration of design methodology of a greatly deepr underground structure, Demonstration of excavation and supplymentary methods of a greatly deepr underground structure, Demonstration of the countermeasure during excavation of a greatly deepr underground structure and Demonstration of the safe construction for a greatly deepr underground structure. In the study in FY2007, the design methodlogy in Phase 1 is verified until 200 m depth on excavation of ventilation shaft. A plan, countermeasure and concept for influence of differential water pressure, long-term maintenance and risk management in the view of geological disposal project were proposed.

Acecsses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.