Refine your search�ソスF     
Report No.
 - 

Pre-excavation grouting in construction of Mizunami Underground Research Laboratory

Hara, Masato; Kinoshita, Harunobu; Ikeda, Koki; Yamamoto, Masaru; Nobuto, Jun*

In the excavation for the ventilation shaft of the Mizunami Underground Research Laboratory, pre-excavation grouting with ordinary Portland cement is conducted to reduce the water inflow. The target value for the hydraulic conductivity of grouted zone is set to be 2 Lugion, considering mainly the capacity of water treatment facility. In this paper, the grouting work conducted up to the depth of GL. -220m is summarized. By reviewing the water inflow and hardened cement injected into rock fractures observed at shaft wall, the validity of grouting method so far is evaluated.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.