Refine your search:     
Report No.
 - 

Refurbishment status on reactor facilities of JMTR

Takemoto, Noriyuki ; Hanawa, Yoshio; Gorai, Shigeru; Fukasaku, Akitomi; Miyazawa, Masataka; Niimi, Motoji

Operation of the Japan Materials Testing Reactor (JMTR), a light-water-cooling tank-type reactor with a 50 MW thermal power, was stopped in August 2006, and now its refurbishment is on going. The reactor facilities are to be refurbished during four years from the beginning of FY 2007, and the renewed JMTR will be operated from FY 2011 until around FY 2030. As for the decision of the refurbishment, reactor facilities to be renewed and to be continuously used were selected from a viewpoint of ensuring safety, improvement of availability-factor, etc. The selected renewal reactor facilities were the reactor instrument and control system, cooling system, radioactive waste facility, power supply system, boiler, etc. Presented are the basic idea on selection of the renewal facilities, outline of these facilities and schedule of refurbishment work.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.