Refine your search�ソスF     
Report No.
 - 

Present status of Refining and Conversion Facility Dismantling; Progress in 2008 first half of the fiscal year

Editorial Committee of Refining and Conversion Facility Decommissioning Results

The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center. Process of natural uranium conversion facility (PNC Process) and reprocessed uranium conversion facility (two-stage dry fluorination system) is in a Refining and Conversion Facility. This building started construction in 1979 and was completed in October 1981. The PNC process operated from March 1982 to March 1991. As a result, uranium hexafluoride of about 385 tonU was manufactured. Also, the reprocessed uranium conversion process operated from December 1982 to July 1999. As a result, uranium hexafluoride of about 338 tonU was manufactured. The demonstration of the demolition method was done using the PNC process after the end of operation. The schedule which will finish dismantling of all equipment in a radiation controlled area is by the 2011 fiscal year. This report summarized the present situation by the first half of the 2008 fiscal year of a Refining and Conversion Facility decommissioning.

Acecsses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.