RF simulation for RFQ designing at J-PARC linac

Morishita, Takatoshi  ; Kondo, Yasuhiro   ; Hasegawa, Kazuo; Naito, Fujio*; Matsumoto, Hiroshi*; Hori, Yoichiro*

The beam commissioning of J-PARC linac has been started since November 2006. After the scheduled shutdown in summer 2007, the beam is successfully delivered from the linac to the RCS. Since then, a stable beam provision to RCS was emphasized. However, the trip in the RFQ was increased at the end of Sept. 2008, then, the stability of the beam operation decreased. To improve this situation, we started to prepare a new RFQ cavity as a backup machine. The RF simulation is underway for the design of this backup RFQ. A basic estimation on the key components on RF properties such as a tuner, a dipole stabilizer, and a local field correction at the vacuum port are described in this proceeding.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.