Refine your search:     
Report No.
 - 

Present status of Japanese tasks on IFMIF/EVEDA Li target system

Nakamura, Kazuyuki ; Ida, Mizuho; Kondo, Hiroo; Watanabe, Kazuyoshi; Furukawa, Tomohiro  ; Hirakawa, Yasushi ; Horiike, Hiroshi*; Fukada, Satoshi*; Terai, Takayuki*; Tsuji, Yoshiyuki*; Furuya, Kazuyuki*

IFMIF/EVEDA started at July in 2007. Li Target System consists of five validation tasks (LF1-5) and one design task (LF6). Present status of Li Test Loop Construction and Operation task (LF1) is to complete the fabrication and installation of the almost key components except Target Assembly and Two types of traps for nitrogen and hydrogen, and to continue the connection with the components by the pipes. In the Diagnostics task (LF2), the characterization of the contact probe level meter is on going in Osaka University. In the Purification System task (LF4), the characterization of the Fe-Ti gettering material in Tokyo University and of Y gettering material in Kyushu University is on going. In the Remote Handling task (LF5), the design of the experimental facility has been finished. In the Engineering Design task (LF6), the engineering design for the IFMIF will be completed based on the validation tasks (LF1-5).

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.