検索対象:     
報告書番号:
※ 半角英数字
 年 ~ 
 年

Commissioning of the IFMIF/EVEDA accelerator prototype; Objectives & plans

国際核融合材料照射施設・工学実証工学設計活動のための原型加速器の調整試験,目的及び計画

Vermare, C.*; Garin, P.*; Shidara, H.*; Beauvais, P. Y.*; Mosnier, A.*; Ibarra, A.*; Heidinger, R.*; Facco, A.*; Pisent, A.*; 前原 直; 高橋 博樹  ; 木村 晴行; 大平 茂; 奥村 義和; 神藤 勝啓   

Vermare, C.*; Garin, P.*; Shidara, H.*; Beauvais, P. Y.*; Mosnier, A.*; Ibarra, A.*; Heidinger, R.*; Facco, A.*; Pisent, A.*; Maebara, Sunao; Takahashi, Hiroki; Kimura, Haruyuki; Ohira, Shigeru; Okumura, Yoshikazu; Shinto, Katsuhiro

In the frame of the IFMIF/EVEDA project, a high-intensity (125 mA) CW deuteron accelerator will be installed and commissioned at the Rokkasho Broader Approach (BA) site. The main objective of this 9 MeV prototype is to provide information on the feasibility of the design, the manufacturing and the operation of the two linacs (up to 40 MeV) foreseen for IFMIF. Based on the requirements for each system (accelerators, lithium target and tests facility) which are deduced from the IFMIF fusion material irradiation requirements, given by the users, the objectives of this accelerator prototype are defined and presented here. Also, because of the distributed nature of the design work and the procurement of the accelerator, organization of the installation and commissioning phase is essential. The installation and commissioning schemes, the organization proposed and the overall plans are presented.

Access

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.