Refine your search:     
Report No.
 - 

Stabiliy evaluation with long FB loop delay in the ACS cavity RF control for the J-PARC 400-MeV Linac

Kobayashi, Tetsuya

For 400-MeV upgrade of the J-PARC Linac. ACS (Annular Coupled Structure) cavities, which are driven by 972-MHz RF, will be installed. The ACS cavity has complicated structure. Its Q-value is very low and the operation frequency is tree times high in comparison with that of the SDTL cavity. So the stabilizing control of the ACS accelerating field will be more difficult than present RF system. Further more the chopped beam loading compensation is required. Especially, a debuncher will be located very far from the klystron, then the feedback loop delay will be about 1.5 us. This presentation will show the simulation results of the feedback control of the ACS cavity field including long loop delay and the effect of the chopped beam loading.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.