Refine your search:     
Report No.
 - 

Status of the J-PARC negative hydrogen ion source

Oguri, Hidetomo  ; Namekawa, Yuya; Okoshi, Kiyonori ; Ueno, Akira  ; Ikegami, Kiyoshi*

A cesium-free H$$^{-}$$ ion source driven with a LaB$$_{6}$$ filament is being operated for J-PARC. As of June 2010, there have been 34 beam commissioning or supply runs. In these runs, the ion source has been successfully operated in two different modes such as low current mode of 5 mA and high current mode of 30 mA. According to the task of the run, one of the two modes was selected. However, the beam current has been restricted to less than 15 mA for the stable operation of the RFQ linac which has serious discharge problem from September 2008. The beam run is performed 1 month cycles, which consisted of a 4-5 weeks beam run and 4 days down-period interval. At the recent beam run, about 600 hours continuous operation was achieved, which is satisfied with the requirement of the ion source lifetime for the J-PARC first stage. At every runs, the beam stop time due to the ion source failure is about one hour, which correspond to the ion source availability of 99%.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.