Refine your search:     
Report No.
 - 

Repairs crack in concrete floor at 3GeV synchrotron accelerator building

Koizumi, Isao*; Suganuma, Kazuaki 

3GeV synchrotron accelerator building was constructed by reinforced concrete, which is the acceleration facility at J-PARC (Japan Proton Accelerator Research Complex). 3GeV synchrotron accelerator building was built in 2005 and beam operation had been performed successfully run since 2008. I had been inspecting of each instruments since beam operation had run. In 2011, inspection list had created and carried out as inspected because of the floor crack is outstanding. This report arranges the inspection of floor crack, inspection records and repair procedures of the 3GeV synchrotron accelerator building.

Acecsses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.