Completion of IFMIF/EVEDA Li test loop construction and commissioning

Kondo, Hiroo; Furukawa, Tomohiro  ; Hirakawa, Yasushi ; Iuchi, Hiroshi; Kanemura, Takuji; Ida, Mizuho; Watanabe, Kazuyoshi; Horiike, Hiroshi*; Yamaoka, Nobuo*; Matsushita, Izuru*; Nakamura, Kazuyuki ; Wakai, Eiichi  

The EVEDA Li test loop (ELTL) successfully completed its construction and commissioning in the frame work of the IFMIF/EVEDA as one of the ITER-BA. The construction was started on Nov. 2009 in the O-arai site of the Japan Atomic Energy Agency and completed on the middle of Nov. 2010. In the commissioning conducted subsequently, the following tests were performed: (1) Li ingots installation into the ELTL, (2) Li charging and draining operation, (3) Li circulation tests. In a final phase of the circulation test, stable liquid Li flow at a velocity of 5 m/s was successfully achieved.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.