Status of main linac cryomodule development for compact ERL project

Umemori, Kensei*; Enami, Kazuhiro*; Furuya, Takaaki*; Sakai, Hiroshi*; Sato, Masato*; Shinoe, Kenji*; Sawamura, Masaru; Cenni, E.*

The Compact ERL, which is a test facility of ERL, is under construction in Japan. For the main linac, one cryomodule, containing two 9-cell superconducting cavities, is under development. Thermal design and cavity alignment have been also carefully considered. Two 9-cell cavities were already fabricated and their performances were confirmed by vertical tests. Their accelerating field reached to 25 MV/m, without field limits. Two input couplers, three HOM absorbers and two Slide-Jack tuners are also under fabrication for the cryomodule. High power processing will be applied for input couplers, at a test stand using a 300 kW klystron. Cooling tolerance and HOM damping abilities were tested for HOM absorbers. Some performance studies were also applied for the tuner at room temperature condition. Cryomodule assembly is planned on this summer. After cooling tests and high power tests will be carried out, ERL beam operation will be started.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.