Refine your search�ソスF     
Report No.
 - 

Information of Broader Approach activities, 35

Ohira, Shigeru

This time, the 4th IFMIF Workshop, operation of the HPC and recent status of the BA Rokkasho Site were reported. In the 4th IFMIF Workshop, which was held in Naka Fusion Institute on 5-9 December 2011, design and manufacture of the systems and components manufactured for the validation tests, the engineering design of IFMIF, etc., were reviewed and discussed. Also introduction of progress and discussion for issues and future plan were done. At the 6th Progress Review Meeting about the CSC HPC held at the JAEA Tokyo Office, the final result of the HPC performance test was reported, which showed that the performance achieved satisfy the goal (or moer), e.g., Linpack: 1.200 Pflop/s (Goal: 1.09 Pflops). The HPC has been operated for the Light House project since 10th of January. In Aomori prefecture, the snow accumulation since the last year reached a level as 2.5 times much as the average. In the Rokkasho BA Site, daily work for snow removal is needed.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.