Refine your search�ソスF     
Report No.
 - 

Design study of J-PARC timing system for nuclear transmutation experimental facility

Ito, Yuichi; Kawase, Masato; Kikuzawa, Nobuhiro ; Ouchi, Nobuo 

A transmutation experimental facility (TEF) is planned in J-PARC 2nd construction phase. 400 MeV/250 kW of negative hydrogen ion beam will be delivered from LINAC to TEF. The LINAC is now operating in repetition of 25 Hz and LINAC should be operated in 50 Hz to keep beam power for existing experimental facilities. The timing system should also be operated in 50 Hz. However, some control subsystems and data acquisition subsystems are strongly optimized for 25 Hz operation especially in RCS. A design for J-PARC timing system to support TEF will be discussed in this report.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.