ITER magnet systems; From qualification to full scale construction

ITERマグネット・システム; 品質検証から実機製作へ

中嶋 秀夫; 辺見 努; 井口 将秀; 名原 啓博; 松井 邦浩; 千田 豊; 梶谷 秀樹; 高野 克敏; 礒野 高明; 小泉 徳潔; 布谷 嘉彦; 濱田 一弥; 奥野 清; Foussat, A.*; Gallix, R.*; Devred, A.*; Libeyre, P.*; Mitchell, N.*; Bonito Oliva, A.*; Bellesia, B.*; Boter, E.*; Cornelis, M.*; Cornella, J.*; Harrison, R.*; Poncet, L.*; Boutboul, T.*; Rajainmaki, H.*; Valente, P.*; Sborchia, C.*; Rodin, I.*; Vysotsky, V. S.*; Chan, K.*; Martovetsky, N.*; Park, S. H.*; Li, H.*; Wu, Y.*; Wei, J.*

Nakajima, Hideo; Hemmi, Tsutomu; Iguchi, Masahide; Nabara, Yoshihiro; Matsui, Kunihiro; Chida, Yutaka; Kajitani, Hideki; Takano, Katsutoshi; Isono, Takaaki; Koizumi, Norikiyo; Nunoya, Yoshihiko; Hamada, Kazuya; Okuno, Kiyoshi; Foussat, A.*; Gallix, R.*; Devred, A.*; Libeyre, P.*; Mitchell, N.*; Bonito Oliva, A.*; Bellesia, B.*; Boter, E.*; Cornelis, M.*; Cornella, J.*; Harrison, R.*; Poncet, L.*; Boutboul, T.*; Rajainmaki, H.*; Valente, P.*; Sborchia, C.*; Rodin, I.*; Vysotsky, V. S.*; Chan, K.*; Martovetsky, N.*; Park, S. H.*; Li, H.*; Wu, Y.*; Wei, J.*

ITER機構及び6国内機関(中国,欧州,日本,韓国,ロシア,米国)は、協力してITERマグネット・システムを製作している。日本,ロシア,中国,韓国は既に実機の超伝導導体の製作を実施している。TFコイル用のラジアルプレートの製作では、欧州及び日本で品質検証が終了し、実機施策の準備が整った。日本は1/3サイズの試作ダミー巻線を実機大ダミー巻線試作の前に実施し、製作方法を検証した。欧州では、実機製作に必要な治具類の準備とその性能検証が進行中である。また、日本は、2個の実機大TF構造物を試作し、製作方法の最適化と工業化を実施した。コレクション・コイルの製作進捗はTFコイル同様に順調であり、巻線治具等の準備はほとんど終了し、品質検証が開始された。その他のマグネットにおいても、2020年の初期プラズマ点火達成に向けて、順調に製作が進んでいる。

The ITER organization and 6 Domestic Agencies (DA) have been implementing the construction of ITER superconducting magnet systems. Four DAs have already started full scale construction of Toroidal Field (TF) coil conductors. The qualification of the radial plate manufacture has been completed, and JA and EU are ready for full scale construction. JA has qualified full manufacturing processes of the winding pack with a 1/3 prototype and made 2 full scale mock-ups of the basic segments of TF coil structure to optimize and industrialize the manufacturing process. Preparation and qualification of the full scale construction of the TF coil winding is underway by EU. Procurement of the manufacturing equipment is near completion and qualification of manufacturing processes has already started. The constructions of other components of the ITER magnet systems are also going well towards the main goal of the first plasma in 2020.