Assembly work and transport of JT-60SA cryostat base
Okano, Fuminori; Masaki, Kei; Yagyu, Junichi; Shibama, Yusuke; Sakasai, Akira; Miyo, Yasuhiko; Kaminaga, Atsushi; Nishiyama, Tomokazu; Suzuki, Sadaaki; Nakamura, Shigetoshi; Shibanuma, Kiyoshi
Japan Atomic Energy Agency started to construct a fully superconducting tokamak experiment device, JT-60SA, to support the ITER since January, 2013 at the Fusion Research and Development Directorate in Naka, Japan. The JT-60SA will be constructed with enhancing the previous JT-60 infrastructures, in the JT-60 torus hall, where the ex-JT-60 machine was disassembled. The JT-60SA Cryostat Base, for base of the entire tokamak structure, were assembly as first step of this construction. The Cryostat Base (CB, 250 tons) is consists of 7 main made of stainless steel, 12m diameter and 3m height. It was built in the Spain and transported to the Naka site with the seven major parts split, via Hitachi port. The assembly work of these steps, preliminary measurements, sole plate adjustments of its height and flatness, and assembly of the CB. Introduces the concrete result of assembly work and transport of JT-60SA cryostat base.