Refine your search:     
Report No.
 - 

High-power test of annular-ring coupled structures for the J-PARC linac energy upgrade

Tamura, Jun  ; Ao, Hiroyuki; Nemoto, Yasuo; Asano, Hiroyuki*; Suzuki, Takahiro*

ACSs are going to increase the beam energy of the J-PARC linac from 181 to 400 MeV. The 2011 Tohoku earthquake damaged the J-PARC facilities and the cavity conditioning was interrupted for two years. After the restoration of the facility, the two ACS cavities (M01 and M11) were conditioned. They achieved to 15-20% above the designed accelerating field of 4.2 MV/m. Since M01 was conditioned six years ago, the conditioning time required for M01 was drastically reduced from that for the first time. During the high-power operation for M11, which is an unique cavity equipped with a capacitive iris in a waveguide, no significant increase of the temperature and the discharge rate around the capacitive iris was observed. The vacuum pressure was sufficiently low (4$$times$$10$$^{-6}$$ Pa) even from the view point of beam loss due to residual gas scattering. The more stable operation can be expected through one-month conditioning before beam commissioning.

Accesses

:

- Accesses

InCites™

:

Percentile:0

Category:Physics, Multidisciplinary

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.