Refine your search:     
Report No.
 - 

Study on engineering technologies in the Mizunami Underground Research Laboratory; FY2012 (Contract research)

Fukaya, Masaaki*; Noda, Masaru*; Hata, Koji*; Takeda, Yoshinori*; Akiyoshi, Kenji*; Ishizeki, Yoshikazu*; Kaneda, Tsutomu*; Sato, Shin*; Shibata, Chihoko*; Ueda, Tadashi*; Toda, Akiko*; Kobayashi, Shinji*; Niimi, Katsuyuki*; Okihara, Mitsunobu*; Tsuji, Masakuni*; Yamada, Toshiko*; Sato, Toshinori  ; Mikake, Shinichiro ; Horiuchi, Yasuharu; Hashizume, Shigeru*

The researches on engineering technology in the Mizunami Underground Research Laboratory (MIU) plan consists of (1) research on engineering technology deep underground, and (2) research on engineering technology as a basis of geological disposal. The former research is mainly aimed in this study, which is categorized in (a) development of design and construction planning technologies, (b) development of construction technologies, (c) development of countermeasure technologies, and (d) development of technologies for security. In this study, the researches on engineering technology are being conducted in these four categories by using data measured during construction as a part of the second phase of the MIU plan.

Acecsses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.