Study on engineering technologies in the Mizunami Underground Research Laboratory (FY 2013); Development of design and construction planning and countermeasure technologies (Contract research)
Kobayashi, Shinji*; Niimi, Katsuyuki*; Okihara, Mitsunobu*; Tsuji, Masakuni*; Yamada, Toshiko*; Sato, Toshinori ; Mikake, Shinichiro ; Horiuchi, Yasuharu*; Aoyagi, Yoshiaki
The researches on engineering technology in the Mizunami Underground Research Laboratory (MIU) plan consists of (1) development of design and construction planning technologies, (2) development of construction technology, (3) development of countermeasure technology, (4) development of technology for security, and (5) development of technologies regarding restoration or reversal and mitigating of the excavation effect. To develop design and construction planning technologies, and countermeasure technology, the analysis of measured data during earthquake and seismic movement characteristics at deep underground, and the examination of grouting method were carried out. The knowledge of the seismic movements at deep underground was obtained by which observation records of seismometers at Mizunami underground research laboratory were analyzed to verify the earthquake-resistant design of the shafts and tunnels. As for" Study on grouting method at deep underground", Existing post-grouting methods for crystalline rock were reviewed, the applicability of pre-grouting technology was evaluated and study on experiment plan in MIU was carried out following the previous year.