Refine your search:     
Report No.
 - 

Progress of activities in the IFMIF/EVEDA lithium test loop, 2-1; EVEDA Li test loop operational test

Kondo, Hiroo; Kanemura, Takuji; Furukawa, Tomohiro  ; Hirakawa, Yasushi ; Wakai, Eiichi  

EVEDA (Engineering Validation and Engineering Design Activity) Li Test Loop, which simulates the hydraulic condition of the Li target and the purification system of the IFMIF Li facility, is under operation in a frame work of the IFMIF/EVEDA. The Li target at a velocity of 15 m/s in a pressurized (0.12 MPa) was validated. In addition, a cold trap was tested and finally operation at 200$$^{circ}$$C (target value) was validated.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.