Refine your search:     
Report No.
 - 

Operation status of compact ERL main linac cryomodule

Umemori, Kensei*; Enami, Kazuhiro*; Furuya, Takaaki*; Michizono, Shinichiro*; Miura, Takako*; Qiu, F.*; Sakai, Hiroshi*; Sato, Masato*; Shinoe, Kenji*; Sawamura, Masaru; Cenni, E.*

We developed ERL main linac cryomodule for Compact ERL (cERL) project, which was constructed in KEK. The module includes two 9-cell L-band superconducting cavities. After construction of cERL recirculation loop, beam operation was started. First electron beam successfully passed the main linac cavities. After adjusting beam optics, energy recovery operation was achieved. Main linac cavity was enough stable for ERL beam operation, however, field emission was a problem for long term operation.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.