Refine your search:     
Report No.
 - 

News from Broader Approach activities, 49

Ishii, Yasutomo; Matsunaga, Go

This time, the 14th BA Steering Committee was held at IFERC in Rokkasho, and RF coil was completed in Dec, 2013 at Superconducting Coil Winding Building, Naka Fusion Institute, JAEA were reported. 2 committee members and 3 specialists from EU side, and also 34 people which is 2 committee members, 19 specialists, 3 Project Leaders, and project committee chair persons, for the 14th BA Steering Committee were discussed about the 2013 annual report of the IFMIF/EVEDA project, the IDERC project and Satellite Tokamak were confirmed and those work plans were renewed. The EF5 coil (8.2 m in outside diameter, 23 tons) and the EF6 coil (10.5 m in outside diameter, 33 tons) which bigger than the EF4 coil (4.4 m in outside diameter, 30 tons) that was produced at factory, were produced at Superconducting Coil Winding Building, Naka Fusion Institute, JAEA and were completed in Dec, 2013. To disseminate information in above to the national community a major event in the BA activities.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.