Refine your search:     
Report No.
 - 

Present status of the J-PARC RCS shift bump magnet

Horino, Koki; Takayanagi, Tomohiro   ; Ueno, Tomoaki; Tobita, Norimitsu*; Yamamoto, Kazami   ; Kinsho, Michikazu  

A user operation with 400 MeV injection beam energy from the LINAC (Linear Accelerator) was started in February 2014. However, in 2015 one year later, the coil support bolt of the horizontal shift bump magnet was felled and the water leakage of the cooling copper pipe of the connection conductor bar was occurred. After the permanent measures, a stable operation has been continued without trouble. This paper reports the contents of the trouble and the permanent measures of the magnet.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.