Refine your search:     
Report No.
 - 

Study on engineering technologies in the Mizunami Underground Research Laboratory (FY 2015); Development of design and construction planning and countermeasure technologies (Contract research)

Toguri, Satohito*; Kobayashi, Shinji*; Tsuji, Masakuni*; Yahagi, Ryoji*; Yamada, Toshiko*; Matsui, Hiroya ; Sato, Toshinori  ; Mikake, Shinichiro ; Aoyagi, Yoshiaki

The study on engineering technology in the Mizunami Underground Research Laboratory (MIU) project roughly consists of (1) development of design and construction planning technologies, (2) development of construction technology, (3) development of countermeasure technology, (4) development of technology for security, and (5) development of technologies regarding restoration and mitigating of the excavation effect. In FY2015, as a part of the important issues on the research program, water-tight grouting method has been developed. Grouting methods utilized in the MIU were evaluated and the post-excavation grouting at the -500m Access/Research Gallery-South was planned based on these evaluation results. Also, technology development from the viewpoint of geological disposal was summarized, and information on the alternative method to the grouting method was collected and organized.

Acecsses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.