Refine your search:     
Report No.
 - 

The In-situ experiment for overpack corrosion at Horonobe Underground Research Laboratory; Production and setting simulated overpack, buffer material blocks and heater

Nakayama, Masashi 

The Horonobe URL Project has being pursued by JAEA to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formation at Horonobe, Hokkaido. The URL Project proceeds in 3 overlapping phases, "Phase I: Surface-based investigations", "Phase II: Investigations during tunnel excavation" and "Phase III: Investigations in the underground facilities", over a period of around 20 years. The OP corrosion test was prepared from 2013 FY at Niche No.3, and heating by electric heater in simulated overpack started in November, 2014. The objective of the test is acquiring data concerned with corrosion of carbon steel OP. These data will be used in order to confirm the performance of engineered barrier system. In the OP corrosion test, the diameter of simulated OP and buffer material are 100 mm and 300 mm, respectively. Concrete support using low alkaline cement was used in order to investigate the effect of cementitious materials to OP corrosion behavior. We will measure corrosion potential of carbon steel, natural potential, pH in buffer material for several years. In this report, we describe how to make simulated OP and buffer material blocks, and set sensors, and so on.

Acecsses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.