Refine your search:     
Report No.
 - 

Evaluation of combined pre- and post-excavation grouting for reducing water inflow under high water pressure condition

Mikake, Shinichiro ; Ikeda, Koki; Matsui, Hiroya ; Tsuji, Masakuni*; Nishigaki, Makoto*

Pre-grouting of shafts and galleries had been conducted during the construction of MIU in the aspect of reducing water inflow. After excavating GL.-500m gallery, a post-grouting was performed on section of the pre-excavation grouting area under high water pressure condition (max: 4MPa). The post-grouting experiment was performed outside of the pre-grouting zone with designs, applying colloidal silica grouting material and complex dynamic grouting. It was estimated that the inflow after post-grouting was reduced by 1/100 of the case that pre- and post-grouting were not performed. These results indicate that the applied combined pre- and post-grouting methodology is effective in reducing water inflow and it can be applicable under high water pressure condition. Then, this paper states the theoretical evaluation of relationship between reduction of hydraulic conductivity and the grouting zone is very convenient and useful for grouting design and estimate of water inflow.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.