Refine your search:     
Report No.
 - 

A Failure investigation of the beam collimator system in the J-PARC 3 GeV rapid cycling synchrotron

Okabe, Kota  ; Yamamoto, Kazami   ; Kamiya, Junichiro   ; Takayanagi, Tomohiro   ; Yamamoto, Masanobu   ; Yoshimoto, Masahiro  ; Takeda, Osamu*; Horino, Koki*; Ueno, Tomoaki*; Yanagibashi, Toru*; Takeishi, Kenichi; Namekawa, Yuya*; Hikichi, Yusuke*; Kato, Shinichi; Takahashi, Hiroki  

The most important issue is to reduce the uncontrolled beam loss in the high intensity hadron accelerator such as J-PARC proton accelerators. The J-PARC 3 GeV Synchrotron (RCS) has a collimator system which narrows a high intensity beam in the RCS. After startup of RCS in 2007, the collimator system of the RCS worked well. However, in April 2016, vacuum leakage at the collimator system occurred during the maintenance operation. To investigate a cause of the failure, we took apart iron shields of the collimator reducing exposed dose of operators. As a result of inspection, we succeeded to identify the cause of the vacuum leakage failure. In this presentation, we report the failure investigation of the beam collimator system in the RCS.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.