Refine your search:     
Report No.
 - 

Status of JRR-3 corresponding to new regulatory standards, 1; Outlie

Wada, Shigeru; Kawamura, Sho; Suzuki, Makoto; Kimura, Kazuya; Nagadomi, Hideki

In 1990, JRR-3 was modified for upgrade and resumed its operation as a high performance and multi-purpose research reactor with thermal power of 20MW. Since modified, JRR-3 has been utilized for neutron beam experiments, neutron activation analysis, production of radioisotopes, neutron transmutation doping of silicon, fuel and material irradiation, etc. The maximum thermal power of JRR-3 is 20MW. JRR-3 is a light water moderated and cooled, pool type research reactor using low-enriched silicide fuel. JRR-3 had been confirmed conformation to new regulations on research and test reactor facilities which came into force on 18th December 2013. The application has been submitted to NRA on 26th September 2014. Finally, installment license of JRR-3 was permitted November in 2018. Restart the JRR-3 is planted in the few years.

Accesses

:

- Accesses

InCites™

:

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.