Refine your search:     
Report No.
 - 

The First replacement of the RF window of the ACS cavity

Tamura, Jun  ; Kondo, Yasuhiro   ; Morishita, Takatoshi  ; Naito, Fujio*; Otani, Masashi*; Nemoto, Yasuo*

In 2013, the Annular-ring Coupled Structure (ACS) cavities were installed to the Japan Proton Accelerator Research Complex (J-PARC) linac. Since then, the ACS cavities have been stably running. Although any serious problem induced by the RF window had not yet observed, we decided to replace the RF window of one ACS cavity by the newly manufactured one. The major motivations of the replacement are to check the surface condition of the RF window which have been under operation for nearly five years, to confirm that the new RF window fully meets specifications, and to learn how much time is required for high-power conditioning of the new RF window. By making use of the summer maintenance period of 2018, we carried out the replacement. This was the first experience for us to replace the RF window installed to the ACS cavity in the linac accelerator tunnel. As for the removed RF window, there was no any abnormal warning found with the visual examination. At the resuming of the cavity operation after the maintenance period, we conducted the high-power conditioning in a measured manner. It took around fifty hours so that the targeted peak power was stably input to the cavity through the new RF window. The ACS cavity with the new RF window is now stably operating.

Accesses

:

- Accesses

InCites™

:

Percentile:0.06

Category:Physics, Particles & Fields

Altmetrics

:

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.