Periodic level measurements of Materials and Life science experimental Facility in J-PARC
Harada, Masahide ; Sakai, Motonobu*; Kurosawa, Takashi*; Haga, Katsuhiro
Materials and Life science experimental Facility (MLF) in J-PARC has a high-intense spallation neutron source and a high-intense muon source induced by 3-GeV and 1MW proton beam. To reduce beam loss, components of proton, neutron and muon beam lines are precisely aligned. However, a settlement of MLF caused by a building construction, installation of heavy shields, earthquakes, consolidation of basement, instrument installation (weight increase), and so on, was assumed in the design stage. Therefore, periodic level measurements in MLF was started from the design stage. A few tens of level measuring points are installed inside and outside MLF. The level measurements were done once per month in the construction stage and per year after operation start. In the construction stage of MLF, it was found that the MLF building largely settled by construction of the building and installation of many shields. And it was also found that The Great East Japan Earthquake on March 11, 2011, caused large settlements of MLF attached buildings. Figure 1 shows fluctuations of measured levels at representative points in each area from December 2011. No critical deterioration (small changes within 1.0 mm) could be detected. However, a few local settlements are found in the MLF building. In the presentation, periodic level measurement results at MLF will be introduced.