Horonobe Underground Research Laboratory Project Investigation report for the 2024 fiscal year

Nakayama, Masashi ; Ishii, Eiichi   ; Aoyagi, Kazuhei  ; Hayano, Akira  ; Murakami, Hiroaki  ; Ono, Hirokazu ; Takeda, Masaki ; Fukatsu, Yuta  ; Mochizuki, Akihito  ; Ozaki, Yusuke  ; Kimura, Shun  ; Dei, Shuntaro  ; Sakuma, Keisuke ; Tamura, Tomonori ; Iwai, Ryo; Kato, Yoshinari; Fujieda, Daigo

The Horonobe Underground Research Laboratory (URL) Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant technologies for geological disposal of high-level radioactive waste through investigating the deep geological environment within the host sedimentary rocks at Horonobe-cho in Hokkaido, north Japan. In the fiscal year 2024, we continued R&D on "Study on near-field system performance in geological environment", "Demonstration of repository design options", and "Understanding of buffering behaviour of sedimentary rock to natural perturbations". These are identified as key R&D on challenges to be tackled in the Horonobe underground research plan for the fiscal year 2020 onwards. Specifically, "full-scale engineered barrier system (EBS) performance experiment" and "solute transport experiment with model testing" were carried out as part of "Study on near-field system performance in geological environment". "Demonstration of engineering feasibility of repository technology" and "evaluation of EBS behaviour over 100$$^{circ}$$C" were addressed for "Demonstration of repository design options". The validation of a method for assessing permeability using the Ductility Index and a method for estimating the state of in-situ ground pressure from hydraulic perturbation tests were investigated as part of the study "Understanding of buffering behaviour of sedimentary rock to natural perturbations". In FY2024, we continued construction of the East Access Shaft and the Ventilation Shaft, and construction of these shafts were completed to a depth of 500 m. After the completion of the East Access Shaft, excavation of the West Access Shaft and 500 m gallery has began. As of the end of FY2024, excavation progress is as follows, the East Access Shaft and the Ventilation Shaft were 500 m depth, the West Access Shaft was 472 m depth, 500 m gallery was 112.9 m, respectively. In the Horonobe International Project (HIP), Management Board and Joint Task Meeting was held at the Horonobe URL in June 2024 to review the progress of construction of galleries and preparations of experiments. Task Meetings to review the implementation plan for in-situ testing and analysis were also held. HIP will be implemented in two phases: Phase 1 (from FY2022 to FY2024) and Phase 2 (from FY2025 to FY2028), the research results of Phase 1 were compiled in FY2024.

Acecsses

:

- Accesses

[CLARIVATE ANALYTICS], [WEB OF SCIENCE], [HIGHLY CITED PAPER & CUP LOGO] and [HOT PAPER & FIRE LOGO] are trademarks of Clarivate Analytics, and/or its affiliated company or companies, and used herein by permission and/or license.