J-PARC LINAC 50 Hz operation verification study
Kondo, Yasuhiro
; Chimura, Motoki
; Cicek, E.*; Fukui, Yuji*; Futatsukawa, Kenta*; Fuwa, Yasuhiro
; Goto, Rikuto*; Hirano, Koichiro
; Ishikawa, Masaki*; Ito, Takashi
; Kitamura, Ryo
; Kosaka, Satoshi*; Miyao, Tomoaki*; Mizobata, Satoshi*; Morishita, Takatoshi
; Moriya, Katsuhiro
; Nakano, Hideto; Nammo, Kesao*; Okoshi, Kiyonori
; Okabe, Kota
; Shibata, Takanori*; Shinto, Katsuhiro
; Takahashi, Hiroki
; Tamura, Jun
; Tasaki, Ryuta*
Various upgrade plans of the J-PARC linac are underway, and repetition-rate doubling project is one of the most important part. Currently, the linac supplies a 400~MeV H
ion beam to the 3~GeV synchrotron (RCS) at a repetition rate of 25~Hz. However, to deliver the beam to both RCS and proton-beam irradiation facility under planning, it is necessary to raise the repetition rate from 25~Hz to 50~Hz. Prior to construction of the beamline to the irradiation facility, we conducted a verification of the 50~Hz operation of all the linac apparatus simultaneously within the current operational limits in May 2025. And also, the verification of the 50~Hz operation of the particle counter system, which is one of the most important safety device of the J-PARC accelerator, was conducted. As a result, any significant problems were not found out, and it is now ready for the upcoming 50~Hz-beam acceleration demonstration. This paper describes this details of the demonstration of the 50~Hz operation, without beam acceleration, of the J-PARC linac.