Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 22

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

High density plasma calculation of J-PARC RF negative ion source

Shibata, Takanori*; Asano, Hiroyuki; Ikegami, Kiyoshi*; Naito, Fujio*; Nammo, Kesao*; Oguri, Hidetomo; Okoshi, Kiyonori; Shinto, Katsuhiro; Takagi, Akira*; Ueno, Akira

AIP Conference Proceedings 1869, p.030017_1 - 030017_11, 2017/08

 Times Cited Count:4 Percentile:82.70(Physics, Applied)

From September 2014, operation of Cs-seeded, multi-cusp, Radio Frequency (RF), hydrogen negative ion source (J-PARC source) has been started. The operation for 1,000 hours of J-PARC source has been achieved with H$$^{-}$$ beam current 45 mA and duty factor of 1.25 % (0.5 msec and 25 Hz). In the present study, mechanisms of hydrogen plasma ramp-up and H$$^{-}$$ production/transport processes in the steady state (which lasts for few 100 us) are investigated by numerical modeling for RF plasma. In the simulation, charged particle (e, H$$^{+}$$, H$$_2^{+}$$, and Cs$$^{+}$$) transport, time variations of inductive and capacitive electromagnetic field, collision processes between charged and neutral (H, H$$_{2}$$) particles are solved simultaneously. The model is applied to KEK parallel computation System-A with 32 nodes and 256 GB memory in order to solve high density RF plasma up to around 10$$^{18}$$ m$$^{-3}$$ with adequate statisticity. In the presentation, time variations of plasma density distributions and average energy are shown with electromagnetic field variations.

Journal Articles

Three-dimensional electronic structures and the metal-insulator transition in Ruddlesden-Popper iridates

Yamasaki, Atsushi*; Fujiwara, Hidenori*; Tachibana, Shoichi*; Iwasaki, Daisuke*; Higashino, Yuji*; Yoshimi, Chiaki*; Nakagawa, Koya*; Nakatani, Yasuhiro*; Yamagami, Kohei*; Aratani, Hidekazu*; et al.

Physical Review B, 94(11), p.115103_1 - 115103_10, 2016/11

AA2016-0587.pdf:2.55MB

 Times Cited Count:18 Percentile:57.73(Materials Science, Multidisciplinary)

In this study, we systematically investigate three-dimensional(3D) momentum-resolved electronic structures of Ruddlesden-Popper-type iridium oxides Sr$$_{n+1}$$Ir$$_{n}$$O$$_{3n+1}$$ using soft-X-ray angle-resolved photoemission spectroscopy (SX-ARPES). Our results provide direct evidence of an insulator-to-metal transition that occurs upon increasing the dimensionality of the IrO$$_{2}$$-plane structure. This transition occurs when the spin-orbit-coupled $$j_{eff}$$ = 1/2 band changes its behavior in the dispersion relation and moves across the Fermi energy. By scanning the photon energy over 350 eV, we reveal the 3D Fermi surface in SrIrO$$_{3}$$ and $$k_{z}$$-dependent oscillations of photoelectron intensity in Sr$$_{3}$$Ir$$_{2}$$O$$_{7}$$. To corroborate the physics deduced using low-energy ARPES studies, we propose to utilize SX-ARPES as a powerful complementary technique, as this method surveys more than one whole Brillouin zone and provides a panoramic view of electronic structures.

Journal Articles

Numerical study of plasma generation process and internal antenna heat loadings in J-PARC RF negative ion source

Shibata, Takanori*; Nishida, Kenjiro*; Mochizuki, Shintaro*; Mattei, S.*; Lettry, J.*; Hatayama, Akiyoshi*; Ueno, Akira; Oguri, Hidetomo; Okoshi, Kiyonori; Ikegami, Kiyoshi*; et al.

Review of Scientific Instruments, 87(2), p.02B128_1 - 02B128_3, 2016/02

BB2015-1473.pdf:4.28MB

 Times Cited Count:3 Percentile:15.11(Instruments & Instrumentation)

A numerical model of plasma transport and electromagnetic field in the J-PARC RF ion source has been developed to understand relation between antenna coil heat loadings and plasma production/transport processes. From the calculation, the local plasma density increase is observed in the region close to the antenna coil. The magnetic field line with absolute magnetic flux density 30-120 Gauss results in the magnetization of electron which leads to high local ionization rate. The results suggest that modification of magnetic configuration can be made to reduce plasma heat flux onto the antenna.

Journal Articles

Present status of J-PARC linac

Oguri, Hidetomo; Hasegawa, Kazuo; Ito, Takashi; Chishiro, Etsuji; Hirano, Koichiro; Morishita, Takatoshi; Shinozaki, Shinichi; Ao, Hiroyuki; Okoshi, Kiyonori; Kondo, Yasuhiro; et al.

Proceedings of 11th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.389 - 393, 2014/10

no abstracts in English

Journal Articles

Operating experience of the J-PARC linac

Hasegawa, Kazuo; Asano, Hiroyuki; Chishiro, Etsuji; Hori, Toshihiko; Ito, Takashi; Kobayashi, Tetsuya; Kondo, Yasuhiro; Namekawa, Yuya; Oguri, Hidetomo; Okoshi, Kiyonori; et al.

Proceedings of 24th International Linear Accelerator Conference (LINAC 2008) (CD-ROM), p.55 - 57, 2009/00

The beam commissioning of the J-PARC linac started in November 2006 and 181 MeV acceleration was successfully achieved in January 2007. The linac has delivered beams to the 3 GeV Rapid Cycling Synchrotron for its commissioning, and then, the subsequent Main Ring Synchrotron and the neutron target commissioning. The linac uses a Cs-free LaB$$_{6}$$-driven ion source and 20 units of 324 MHz klystrons. As of June 2008, the operation times are about 3,000 and 6,000 hours for the ion source and the RF source, respectively. The operating experience of the linac is described.

Journal Articles

Alignment of cavities and magnets at J-PARC linac

Morishita, Takatoshi; Ao, Hiroyuki; Asano, Hiroyuki; Ito, Takashi; Ueno, Akira; Okawa, Tomohiro; Hasegawa, Kazuo; Ikegami, Masanori*; Naito, Fujio*; Tanaka, Hirokazu*; et al.

Proceedings of 10th International Workshop on Accelerator Alignment (IWAA 2008) (Internet), 6 Pages, 2008/02

It has been widely accepted that an accurate alignment is essential to achieve high beam quality and highly stable operation increasingly demanded in recent particle accelerators. The J-PARC linac components are finely aligned based on the precise survey network, where we have emphasized on attaining the smoothness between adjacent elements. A floor elevation of the accelerator tunnel has been periodically measured since the completion of the linac building to correct the error by the settlement. The alignment of the linac components have been finished at Sep. 2006 and the beam commissioning has been started at Nov. 2006. After a coarse adjustment of the RF phase and amplitude, nearly complete beam transmission was easily established without using steering magnet. This successful beam transport proves the validity of the alignment strategy and the accurateness of the alignment procedure.

Journal Articles

Status of the ACS cavity development for the J-PARC linac energy upgrade

Ao, Hiroyuki; Hirano, Koichiro; Morishita, Takatoshi; Asano, Hiroyuki; Naito, Fujio*; Ueno, Akira; Ikegami, Masanori*; Hasegawa, Kazuo; Yamazaki, Yoshishige; Paramonov, V.*

Proceedings of 5th Annual Meeting of Particle Accelerator Society of Japan and 33rd Linear Accelerator Meeting in Japan (CD-ROM), p.494 - 496, 2008/00

The J-PARC ACS cavity consists of many cell parts. For the mass production, the ACS requires about 1300 cell parts, so that it is important to reduce the machining time. In the previous ACS model, it took about three hours per one coupling slot. We, therefore, optimized the slot design, the tolerance, and the machining process. As a result, the machining time reduced to forty-five minutes per one slot. The four test cells were fabricated to measure the frequencies and Q-values, and these results were compared with the electromagnetic analysis with the Microwave Studio. Between the analysis and the measurement, the differences are 1$$sim$$1.5 MHz and 4$$sim$$5 MHz, respectively, for the accelerating mode, and for the coupling mode.

Journal Articles

High energy heavy ion induced structural disorder in Li$$_{2}$$TiO$$_{3}$$

Nakazawa, Tetsuya; Naito, Akira*; Aruga, Takeo; Grismanovs, V.*; Chimi, Yasuhiro; Iwase, Akihiro*; Jitsukawa, Shiro

Journal of Nuclear Materials, 367-370(2), p.1398 - 1403, 2007/08

 Times Cited Count:45 Percentile:92.74(Materials Science, Multidisciplinary)

no abstracts in English

Journal Articles

The DTL/SDTL alignment of the J-PARC linac

Morishita, Takatoshi; Asano, Hiroyuki; Ito, Takashi; Ueno, Akira; Hasegawa, Kazuo; Naito, Fujio*; Takasaki, Eiichi*; Tanaka, Hirokazu*; Yoshino, Kazuo*; Ikegami, Masanori*

Proceedings of 2007 Particle Accelerator Conference (PAC '07) (Internet), p.1523 - 1525, 2007/06

J-PARC linear accelerator components have been installed. The required alignment accuracy in the J-PARC linac is 0.1mm in transverse direction. In the DTL/SDTL section, the fine alignment was carried out by using an optical alignment telescope along with the cavity installation. The displacement of the DTL by the unit tank connection was monitored by a laser tracker to obtain the tolerable displacement between unit tanks. The heights of cavities and magnets were compensated form the unequal ground movement of the linac tunnel. Finally, all the cavities and magnets are aligned within the tolerable alignment error.

Journal Articles

An Alignment of J-PARC linac

Morishita, Takatoshi; Ao, Hiroyuki; Ito, Takashi; Ueno, Akira; Hasegawa, Kazuo; Ikegami, Masanori*; Kubota, Chikashi*; Takasaki, Eiichi*; Tanaka, Hirokazu*; Naito, Fujio*; et al.

Proceedings of 2nd Annual Meeting of Particle Accelerator Society of Japan and 30th Linear Accelerator Meeting in Japan, p.266 - 268, 2005/07

J-PARC linear accelerator components are now being installed in the accelerator tunnel. Markings are placed on the floor, which act as a reference for the initial alignment at the installation. A planned and ongoing alignment schemes for the installation of linac components and watching the long term motion of the building are described.

Journal Articles

An Alignment of J-PARC linac

Morishita, Takatoshi; Ao, Hiroyuki; Ito, Takashi; Ueno, Akira; Hasegawa, Kazuo; Ikegami, Masanori*; Kubota, Chikashi*; Naito, Fujio*; Takasaki, Eiichi*; Tanaka, Hirokazu*; et al.

Proceedings of 2005 Particle Accelerator Conference (PAC '05) (CD-ROM), p.2851 - 2853, 2005/00

In J-PARC linac, a precise alignment of accelerator components is essential for high quality beam acceleration. Markings have been placed on the floor, which act as a reference for the initial alignment at the installation. For a straight line alignment, the wire position sensor is placed on the offset position with respect to the beam center by a target holder. The hydrostatic levering system is used for watching the floor elevation over the long period.

Journal Articles

DNS of turbulent channel flow with MHD at high Reynolds number

Satake, Shinichi*; Kunugi, Tomoaki*; Naito, Norihito*; Takase, Kazuyuki; Ose, Yasuo*

Dai-18-Kai Suchi Ryutai Rikigaku Shimpojiumu Koen Yoshishu (CD-ROM), 4 Pages, 2004/12

no abstracts in English

Journal Articles

Beam commissioning of the J-PARC linac DTL1 at KEK

Kondo, Yasuhiro; Akikawa, Hisashi; Anami, Shozo*; Asano, Hiroyuki*; Fukui, Yuji*; Igarashi, Zenei*; Ikegami, Kiyoshi*; Ikegami, Masanori*; Ito, Takashi; Kawamura, Masato*; et al.

Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.156 - 158, 2004/08

A commissioning of the J-PARC linac DTL1 is now under way at KEK. A 30mA H$$^{-}$$ beam was accelerated to 19.7-MeV, and 100% transmission was obtained with a 20-msec-pulse-width and 12.5-Hz-repetition beam. In this paper, present status of the DTL1 commissioning and preliminary results of the commissioning, such as emittance measurements, are presented.

Journal Articles

An Alignment system of J-PARC linac

Morishita, Takatoshi; Ao, Hiroyuki; Ito, Takashi; Ueno, Akira; Hasegawa, Kazuo; Ikegami, Masanori*; Kubota, Chikashi*; Takasaki, Eiichi*; Tanaka, Hirokazu*; Naito, Fujio*; et al.

Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.671 - 673, 2004/08

A precise alignment of accelerator components is essential for the J-PARC linear accelerator. The wire position sensor is applied to measure the accelerator component positioning and the ground motion of the building is measured by the hydrostatic leveling sensors. In this paper, the scheme of the alignment system is presented.

JAEA Reports

Effects of ships vibration and motion on plant parameters; Report on sea trials of nuclear ship MUTSU made first in Japan

Kakuta, Tsunemi; Kitamura, Toshikatsu; Mizushima, Toshihiko; ; ; ; ; ;

JAERI-M 92-034, 82 Pages, 1992/03

JAERI-M-92-034.pdf:2.36MB

no abstracts in English

JAEA Reports

Japan nuclear ship sea trial

; Kitamura, Toshikatsu; Mizushima, Toshihiko; Kakuta, Tsunemi; ; ; ; ; ;

JAERI-M 91-212, 107 Pages, 1992/01

JAERI-M-91-212.pdf:3.05MB

no abstracts in English

JAEA Reports

JAEA Reports

JAEA Reports

Experiments for the Assessment on Source Geometry of PWR Spent Fuel Assembly

; ; ; ; ; ; ; ; ; ; et al.

JAERI-M 82-202, 50 Pages, 1982/12

JAERI-M-82-202.pdf:1.43MB

no abstracts in English

22 (Records 1-20 displayed on this page)