Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Walsh, M.*; Andrew, P.*; Barnsley, R.*; Bertalot, L.*; Boivin, R.*; Bora, D.*; Bouhamou, R.*; Ciattaglia, S.*; Costley, A. E.*; Counsell, G.*; et al.
Proceedings of 23rd IAEA Fusion Energy Conference (FEC 2010) (CD-ROM), 8 Pages, 2011/03
The ITER device is currently under construction. To fulfil its mission, it will need a set of measurement systems. These systems will have to be robust and satisfy many requirements hitherto unexplored in Tokamaks. Typically, diagnostics occupy either a removable item called a port plug, or installed inside the machine as an intricate part of the overall construction. Limited space availability has meant that many systems have to be grouped together. Installation of the diagnostic systems has to be closely planned with the overall schedule. This paper will describe some of the challenges and systems that are currently being progressed.
Donn, A. J. H.*; Costley, A. E.*; Barnsley, R.*; Bindslev, H.*; Boivin, R.*; Conway, G.*; Fisher, R.*; Giannella, R.*; Hartfuss, H.*; von Hellermann, M. G.*; et al.
Nuclear Fusion, 47(6), p.S337 - S384, 2007/06
被引用回数:331 パーセンタイル:78.95(Physics, Fluids & Plasmas)「ITER物理基盤」は、その名の通りITERプラズマの物理基盤を与えるために編纂されたレビュー論文であり、Nuclear Fusion誌の特集号として1999年に発刊された。本「ITER物理基盤の進展」は、「ITER物理基盤」発刊以降に得られた研究開発成果を纏めたレビュー論文である。そのうち、第7章は、ITERにおけるプラズマ計測について包括的に取り扱うものである。主な項目は以下の通り。(1)ITERでの計測に対する要求性能,(2)ITERに適用する計測の原理と手法,(3)ITERでの計測の実現のために必要な技術開発項目,(4)ITERトカマク装置への計測機器の統合,(5)「ITER物理基盤」で提起された主要課題の進展状況,(6)ITERにおける計測性能の評価,(7)将来の核融合炉に向けてITERで学習すべき課題。