検索対象:     
報告書番号:
※ 半角英数字
 年 ~ 
 年
検索結果: 3 件中 1件目~3件目を表示
  • 1

発表形式

Initialising ...

選択項目を絞り込む

掲載資料名

Initialising ...

発表会議名

Initialising ...

筆頭著者名

Initialising ...

キーワード

Initialising ...

使用言語

Initialising ...

発行年

Initialising ...

開催年

Initialising ...

選択した検索結果をダウンロード

論文

Engineering validation and engineering design of lithium target facility in IFMIF/EVEDA project

若井 栄一; 近藤 浩夫; 金村 卓治; 古川 智弘; 平川 康; 渡辺 一慶; 井田 瑞穂*; 伊藤 譲; 新妻 重人; 枝尾 祐希; et al.

Fusion Science and Technology, 66(1), p.46 - 56, 2014/07

 被引用回数:4 パーセンタイル:30.92(Nuclear Science & Technology)

EVEDA Lithium Test Loop (ELTL) has been designed and constructed, has operated a liquid lithium flow test facility with the world's highest flow rate and has succeeded in generating a 100-mm-wide and 25-mm-thick free-surface lithium flow along a concave back plate steadily at a high speed of 20 m/s at 300$$^{circ}$$C for the first time in the world. This result will greatly advance the development of an accelerator-based neutron source to high energy and high density, one of the key objectives of the fusion reactor materials development under the BA (Broader Approach) Activities. Recent related engineering validation and engineering design of the lithium facility has been evaluated.

論文

Status of engineering design of liquid lithium target in IFMIF-EVEDA

中村 博雄; Agostini, P.*; 荒 邦章; 深田 智*; 古谷 一幸*; Garin, P.*; Gessii, A.*; Giusti, D.*; Groeschel, F.*; 堀池 寛*; et al.

Fusion Engineering and Design, 84(2-6), p.252 - 258, 2009/06

 被引用回数:25 パーセンタイル:83.26(Nuclear Science & Technology)

In IFMIF, target system consists of a target assembly, a Li main loop and a Li purification loop. In this paper, status of the engineering design of the IFMIF Li target system performed in 2007/2008 will be described. Major design requirement is to provide a stable Li at a speed of 10 m/s to 20 m/s. To realize stable Li flow, modification of the backplate with nearly constant radius curvature is applied. 3D thermal-hydraulic analysis of the Li target flow is in progress. By a hot trap, nitrogen concentration shall be controlled below 10 wppm. Tritium concentration shall be controlled by an yttrium hot trap below 1 wppm. The back-plate made of RAFM steel shall be used under intense neutron irradiation (50 dpa/y). To mitigate irradiation damage of the backplate, in-situ annealing up to 600$$^{circ}$$C is considered. To replace the backplate, two design options of the remote handling systems are under investigation.

口頭

IFMIF/EVEDA事業のリチウムターゲット施設の開発状況

若井 栄一; 近藤 浩夫; 金村 卓治; 古川 智弘; 平川 康; 中庭 浩一; 伊藤 譲; 田中 浩; 辻 義之*; 伊藤 高啓*; et al.

no journal, , 

IFMIF/EVEDA事業ではリチウムターゲット施設開発のため、実機の約1/3の流量(最大3000リットル/分)を持つリチウム試験ループを原子力機構大洗研究開発センターに建設し、各種機器の機能性試験及び総合性能試験を実施している。平成26年2月に250$$^{circ}$$Cにて高真空下で(15m/s)高速自由表面を持つ高速Li流動試験に成功した。また、欧州キャビテーション計測を協力・実施した。本リチウムターゲット系研究開発の活動は大学連携協力試験下で、計測系、純化系、遠隔操作系の各種実証試験・評価を実施している。各テーマでは、まだ残された課題がいくつもあるが、IFMIF建設判断に必要な、より明確な工学実証評価を平成26年度に完了させる予定である。

3 件中 1件目~3件目を表示
  • 1