Fundamental study on scheduling of inspection process for fast reactor plants

鈴木 正昭*; 伊藤 真理*; 橋立 竜太; 高橋 慧多; 矢田 浩基; 高屋 茂

2020 9th International Congress on Advanced Applied Informatics (IIAI-AAI 2020), p.797 - 801, 2021/07

To realize the reasonable and effective maintenance of nuclear power plants, it is essential to optimize the maintenance scheduling management from the viewpoints of both safety and efficiency. As a fundamental study, we propose an inspection-process-scheduling model that minimizes the total number of inspections in a fast reactor. In this study, we formulate the inspection-process-scheduling problem as an integer programming problem. Computing the inspection-process schedules for a simplified fast reactor plant model, we verified that the proposed model can provide the optimal schedule automatically.

報告書

HTTRのPGX黒鉛構造物の受入検査における渦流探傷試験

石原 正博; 七種 明雄; 伊与久 達夫; 塩沢 周策; 大岡 紀一; 神戸 護*; 高橋 正昭*

JAERI-M 93-252, 39 Pages, 1994/01

JAERI-M-93-252.pdf:0.82MB

高温工学試験研究炉(HTTR)の炉心支持黒鉛構造物のうち、原子炉級準等方性PGX黒鉛構造物の受入検査として渦流探傷試験を計画している。多孔質材料である黒鉛材料は、金属材料と特性が異なり、鋼構造物等の金属材料に対して確立された渦流探傷試験方法をそのまま黒鉛構造物に適用できない。このため、原子炉級微粒等方性IG-110黒鉛については、既に渦流探傷試験の方法等を策定した。しかしながら、PGX黒鉛は、IG-110黒鉛に比べ粒径が大きく、さらにより気孔径も大きく探傷面での表面状態に相違があるため、渦流探傷試験による欠陥の検出性が異なり、IG-110黒鉛に対する規定をそのまま適用できない。このため、PGX黒鉛の欠陥の検出性を調べ渦流探傷試験の方法及び条件を策定した。

報告書

HTTRのIG-110黒鉛構造物の受入検査における渦流探傷試験

石原 正博; 七種 明雄; 伊与久 達夫; 塩沢 周策; 大岡 紀一; 神戸 護*; 高橋 正昭*; 田中 康博*; 進藤 嘉久*; 河江 秀俊*

JAERI-M 93-197, 44 Pages, 1993/09

JAERI-M-93-197.pdf:1.06MB

高温工学試験研究炉(HTTR)の炉心及び炉心支持黒鉛構造物のうち原子炉級微粒等方性IG-110黒鉛製品に対しては、非破壊検査として渦流探傷試験を計画している。金属材料に対する渦流探傷試験の実績は十分有り、その検査基準は確立されている。しかしながら、多孔質材料の黒鉛材料は金属材料と特性が異なるため、鋼構造物の渦流探傷試験方法をそのまま黒鉛構造物に適用できない。このため、IG-110黒鉛製品を対象とした渦流探傷傷試験の方法及び条件を明確にした。

論文

Present status of industrial X ray(bremsstrahlung) technology and advantages of X rays as a food irradiation source

武久 正昭*; 斉藤 敏夫*; 高橋 徹*; 佐藤 利男*; 田中 進; 上松 敬; 谷口 周一*; 坂本 勇*

Cost-benefit Aspects of Food Irradiation Processing; IAEA-SM-328/22, p.243 - 257, 1993/00

工業利用、照射サービス、デモンストレーション用として世界で数ヶ所のX線照射施設が嫁働している。この報告では、1991年から照射サービス用として稼働しているRIC施設の概要、その施設で食品を照射した場合の性能をDEXコードにより計算した結果を述べる。計算結果から、X線の透過能力は、高密度の食品を大きいコンテナーに入れた場合の照射に有効であることが明らかとなった。また、食品照射用のコンベアシステムを開発すれば、X線は工業的な食品照射用線源として充分な性能を持つことが分かった。

論文

Radiation-induced polymerization of ethylene in a pilot plant, I; Bulk process

武久 正昭; 町 末男; 渡辺 博正; 上野 隆志*; 高橋 清一*; 土屋 良二*; 大田黒 寛治*; 元田 庸*; 高坂 佳夫*; 宮永 一清*; et al.

J.Appl.Polym.Sci., 24(3), p.853 - 864, 1979/00

 被引用回数:5

圧力225~400kg/cm$$^{2}$$、温度30~90$$^{circ}$$C、エチレン送入量5~28kg/hr、線量率3.8$$times$$10$$^{5}$$rad/hrの条件範囲で、10$$^{l}$$の反応器を有するパイロットプラントを用いて、エチレンの放射線気相重合の開発研究を行った。重合速度と分子量はいずれも平均滞留時間と圧力の増加により増大し、温度の上昇によって低下する傾向を示した。重合速度および分子量は、それぞれ3.5~13.1g/l・hr、および2.2$$times$$10$$^{4}$$~1.4$$times$$10$$^{5}$$の範囲であった。本実験結果はベンチプラントによる結果と良く一致し、規模効果が小さいことが明らかになった。反応中にポリマーが反応器壁や撹拌翼等に付着し、長時間の連続運転を阻害することが判明した。ポリマーの付着量は反応時間の2乗に比例して増大し、付着速度はポリマー濃度および圧力の3乗に比例した。

論文

中間規模試験装置によるエチレンの放射線重合,1;流通法によるエチレンの放射線重合

武久 正昭; 大田黒 寛治*; 柿崎 利勝*; 元田 庸*; 高橋 清一*; 山本 康夫*; 三井 光; 上野 隆志*; 町 末男; 土屋 良二*; et al.

第8回日本アイソトープ会議報文集, A-RC-6, 3 Pages, 1968/00

放射線化学の開発研究の一環として行なってきたエチレンの放射線重合の第1段階として気相重合で粉末ポリエチレンを製造することを目的とした反応器容積1l、および10lの流通法重合装置を建設し、約2年間にわたって本プロセスに対する工学的知見ならびに放射線重合ポリエチレンの実用物性測定に必要な試料を提供することを目的として運転を行なってきた。本報告は装置の構成,運転結果,スケールアップ効果,長時間運転時の問題点を要約したものである。

口頭

高速炉の最適点検工程スケジューリングに関する基礎的検討

鈴木 正昭*; 伊藤 真理*; 橋立 竜太; 高橋 慧多; 矢田 浩基; 高屋 茂

no journal, , 

To achieve the reasonable and effective maintenance of nuclear power plants, it is essential to optimize the aging management from the viewpoints of both safety and efficiency. We propose an inspection-process-scheduling model that minimizes the number of inspection activities in a fast reactor. In this study, we formulate the inspection-process-scheduling problem as mixed integer programming and 0-1 integer programming problem.

口頭

Long-term maintenance scheduling for fast reactor plants

伊藤 真理*; 鈴木 正昭*; 橋立 竜太; 高橋 慧多; 矢田 浩基; 高屋 茂

no journal, , 

To realize the rational preventive maintenance of nuclear power plants, it is essential to manage the inspection processes for the long term from the viewpoints of both safety and economy. However, it is difficult to manually create a long-term maintenance schedule because of the many components and processes involved. Herein, we propose a long-term maintenance scheduling model for a sodium-cooled fast reactor plant. The long-term maintenance scheduling problem is divided into two segments: (a) determining the monthly inspection targets in a 10-year scheduling period and (b) determining the daily inspection process in a 1-month scheduling period. For these integer programming problems, we first solve the inspection component scheduling problem in order to minimize the total number of inspections while ensuring safety; then, we solve the inspection process scheduling problem that considers the precedence and resource constraints among the processes.

口頭

Optimal scheduling of inspection process for fast reactor via integer programming

鈴木 正昭*; 伊藤 真理*; 橋立 竜太; 高橋 慧多; 矢田 浩基; 高屋 茂

no journal, , 

To realize the reasonable and effective maintenance of nuclear power plants, it is essential to optimize the aging management from the viewpoints of both safety and efficiency. However, maintenance scheduling is currently manually handled, which is a time-consuming process because of the large number of components and constraints that must be taken into account when creating a schedule. Our final objective is to develop and implement an automatic scheduling system using the mathematical technique of Operations Research for addressing the inspection-process-scheduling problem in a fast reactor plant. As a fundamental study, we proposed an inspection-process-scheduling model that minimizes the total number of inspections in a fast reactor while ensuring the reliability of the safety-critical functions. Computing the inspection-process schedules for a simplified fast reactor plant model, we managed to verify that the proposed model can provide the optimal schedule. The proposed model can make it possible to quantitatively evaluate the trade-off between the reliability of the safety-critical functions and the maintenance cost.

口頭

Long-term scheduling of inspection process for evaluating operability and maintainability of fast reactor plants

鈴木 正昭*; 伊藤 真理*; 橋立 竜太; 高橋 慧多; 矢田 浩基; 高屋 茂

no journal, , 

To realize the reasonable and effective maintenance of nuclear power plants, it is essential to optimize the aging management from the viewpoints of both safety and efficiency. However, maintenance scheduling is currently manually handled, which is a time-consuming process because of the large number of components and constraints that must be taken into account when creating a schedule. Besides, there is plenty of room for improvement in the schedules because most of the maintenance requirements are manually checked. Furthermore, to develop next-generation power plants with excellent operability, it is necessary to make it possible to evaluate operability and maintainability in advance at the design stage. Our final objective is to develop and implement an automatic scheduling system using the mathematical technique of Operations Research for addressing the inspection-process-scheduling problem in a sodium-cooled fast reactor plant.

口頭

高速炉の運用性分析のための点検工程スケジューリングシステムの開発

鈴木 正昭*; 伊藤 真理*; 橋立 竜太; 高橋 慧多; 矢田 浩基; 高屋 茂

no journal, , 

保全計画は現在、手動で処理されているが、計画作成時に考慮する必要のある機器と制約が多いので、時間がかかる。また、運用性に優れた次世代プラント開発には、設計段階で事前に運用性や保守性を評価できるようにする必要がある。そこで、オペレーションズリサーチの数学的手法を用いて、ナトリウム冷却高速炉プラントの検査計画の問題に対処するための自動スケジューリングシステムを開発および実装することを目的として、計算コストを削減するために2段階で最適化を実行するモデルを構築した。

口頭

高速炉における点検スケジューリング支援システムの試作

伊藤 真理*; 鈴木 正昭*; 橋立 竜太; 高橋 慧多; 矢田 浩基; 高屋 茂

no journal, , 

原子力プラントの合理的で効果的な保全を実現するためには、安全性と効率性の両観点から経年化管理を最適化することが不可欠である。しかしながら現在、保全スケジューリングは人の手により行われており、機器数が膨大であることに加えて各点検項目に応じた制約条件を満たさなければならないなど複雑であることから、多大な時間を要するプロセスとなっている。加えて、人手によるものであることから、合理化の余地を多分に残しているものと考えられる。本研究では、ナトリウム冷却高速炉を対象とし、従来は手作業で行われているプラント点検工程の組み立てプロセスを数理的手法により自動で行い最適化するシステムを報告する。

口頭

群知能によるナトリウム冷却高速炉の最適点検工程スケジュールの学習

鈴木 正昭*; 伊藤 真理*; 橋立 竜太; 高橋 慧多; 矢田 浩基; 高屋 茂

no journal, , 

次世代高速炉の安全性と経済性を両立した円滑な運用を実現するには、保全を考慮した設計の実施が重要となる。現状では建設前の段階で繰り返し運用性を評価して保全上の課題となる設計を抽出する技術はなく、ボトルネックとなっている。本講演では進化計算により種々の制約を満足する点検工程を自動構築する手法について述べる。

口頭

群知能を用いたナトリウム冷却高速炉の点検工程スケジュールの分析

鈴木 正昭*; 伊藤 真理*; 橋立 竜太; 高橋 慧多; 矢田 浩基; 高屋 茂

no journal, , 

次世代高速炉の安全性と経済性を両立した円滑な運用を実現するには、保全を考慮した設計の実施が重要となる。現状では建設前の段階で繰り返し運用性を評価して保全上の課題となる設計を抽出する技術はなく、ボトルネックとなっている。本研究では、群知能技術を用い、ナトリウム冷却高速炉における様々な制約条件を満たす点検工程を学習・解析する。