Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
上野 恭裕*; 青木 正治*; 深尾 祥紀*; 東 芳隆*; 樋口 嵩*; 飯沼 裕美*; 池戸 豊*; 石田 勝彦*; 伊藤 孝; 岩崎 雅彦*; et al.
Hyperfine Interactions, 238(1), p.14_1 - 14_6, 2017/11
被引用回数:3 パーセンタイル:86.59(Physics, Atomic, Molecular & Chemical)MuSEUM is an international collaboration aiming at a new precise measurement of the muonium hyperfine structure at J-PARC (Japan Proton Accelerator Research Complex). Utilizing its intense pulsed muon beam, we expect a ten-fold improvement for both measurements at high magnetic field and zero magnetic field. We have developed a sophisticated monitoring system, including a beam profile monitor to measure the 3D distribution of muonium atoms to suppress the systematic uncertainty.
Strasser, P.*; 青木 正治*; 深尾 祥紀*; 東 芳隆*; 樋口 嵩*; 飯沼 裕美*; 池戸 豊*; 石田 勝彦*; 伊藤 孝; 岩崎 雅彦*; et al.
Hyperfine Interactions, 237(1), p.124_1 - 124_9, 2016/12
被引用回数:7 パーセンタイル:90.97(Physics, Atomic, Molecular & Chemical)At the Muon Science Facility (MUSE) of J-PARC (Japan Proton Accelerator Research Complex), the MuSEUM collaboration is planning new measurements of the ground state hyperfine structure (HFS) of muonium both at zero field and at high magnetic field. The previous measurements were performed both at LAMPF (Los Alamos Meson Physics Facility) with experimental uncertainties mostly dominated by statistical errors. The new high intensity muon beam that will soon be available at MUSE H-Line will provide an opportunity to improve the precision of these measurements by one order of magnitude. An overview of the different aspects of these new muonium HFS measurements, the current status of the preparation, and the results of a first commissioning test experiment at zero field are presented.
足立 泰平*; 池戸 豊*; 西山 樟生*; 薮内 敦*; 長友 傑*; Strasser, P.*; 伊藤 孝; 髭本 亘; 小嶋 健児*; 牧村 俊助*; et al.
JPS Conference Proceedings (Internet), 8, p.036017_1 - 036017_4, 2015/09
We report on the tuning of the ultra-slow muon beam line at J-PARC MUSE using Li impurities in a tungsten muonium production target in place of positive muons. Li ions were evaporated from the tungsten target by heating it up to 2000K and were transported in the ultra-slow muon beam line. The Li ion beam was monitored by micro channel plates installed at several points in the beam line. The Li beam was successfully transported to the end of the beam line after optimization of beam line parameters.
松崎 禎一郎*; 石田 勝彦*; 永嶺 謙忠*; 坂元 真一*; 鳥養 映子*; 工藤 博司; 棚瀬 正和; 加藤 岑生; 梅澤 弘一
Muon Catal. Fusion, 5-6, p.387 - 394, 1991/00
東大との協力研究として進めているミュオン触媒核融合(CF)実験の研究成果の一つとして、高純度D-Tガスの調製およびターゲット容器への封入技術について報告する。高純度トリチウムガスはJMTRで照射したLi-Al合金ターゲツトからトリチウム製造試験装置を用いて製造し、ガスクロマトグラフ法によって99%以上に濃縮した。800Ciの高純度・高濃縮トリチウムガスを重水素ガスと混合し(T:D=1:3)した後、二重密封のターゲット容器に封入し、溶接により密封した。ミュオン照射にあたっては、この混合ガスを20Kに冷却して液化し、CF実験に使用した。
永嶺 謙忠*; 松崎 禎市郎*; 石田 勝彦*; 渡辺 康*; 坂元 真一*; 岩崎 雅彦*; 三宅 康博*; 西山 樟生*; 鳥養 映子*; 栗原 秀樹*; et al.
Muon Catal. Fusion, 5-6, p.289 - 295, 1991/00
トリチウム濃度30%の液体D-Tターゲットにパルスビームを照射し、ミューオン触媒核融合実験を行った。-付着現象にともない生成する原子から放出される特性X線(8.2keV)の直接測定に成功した。また、測定したX線のスペクトル幅(0.640.22keV)は、ドップラー効果を考慮した理論に一致した。X線の強度から、実効付着率として=0.340.13%を得た。