Nemoto, Takahiro; Arakawa, Ryoki; Kawakami, Satoru; Nagasumi, Satoru; Yokoyama, Keisuke; Watanabe, Masashi; Onishi, Takashi; Kawamoto, Taiki; Furusawa, Takayuki; Inoi, Hiroyuki; et al.
JAEA-Technology 2023-005, 33 Pages, 2023/05
During shut down of the HTTR (High Temperature engineering Test Reactor) RS-14 cycle, an increasing trend of filter differential pressure for the helium gas circulator was observed. In order to investigate this phenomenon, the blower of the primary helium purification system was disassembled and inspected. As a result, it is clear that the silicon oil mist entered into the primary coolant due to the deterioration of the charcoal filter performance. The replacement and further investigation of the filter are planning to prevent the reoccurrence of the same phenomenon in the future.
Yamamoto, Kazami; Kinsho, Michikazu; Hayashi, Naoki; Saha, P. K.; Tamura, Fumihiko; Yamamoto, Masanobu; Tani, Norio; Takayanagi, Tomohiro; Kamiya, Junichiro; Shobuda, Yoshihiro; et al.
Journal of Nuclear Science and Technology, 59(9), p.1174 - 1205, 2022/09
Times Cited Count:3 Percentile:84.2(Nuclear Science & Technology)In the Japan Proton Accelerator Research Complex, the purpose of the 3 GeV rapid cycling synchrotron (RCS) is to accelerate a 1 MW, high-intensity proton beam. To achieve beam operation at a repetition rate of 25 Hz at high intensities, the RCS was elaborately designed. After starting the RCS operation, we carefully verified the validity of its design and made certain improvements to establish a reliable operation at higher power as possible. Consequently, we demonstrated beam operation at a high power, namely, 1 MW. We then summarized the design, actual performance, and improvements of the RCS to achieve a 1 MW beam.
Hamamoto, Shimpei; Shimizu, Atsushi; Inoi, Hiroyuki; Tochio, Daisuke; Homma, Fumitaka; Sawahata, Hiroaki; Sekita, Kenji; Watanabe, Shuji; Furusawa, Takayuki; Iigaki, Kazuhiko; et al.
Nuclear Engineering and Design, 388, p.111642_1 - 111642_11, 2022/03
Times Cited Count:0 Percentile:0.01(Nuclear Science & Technology)Following the Fukushima Daiichi Nuclear Power Plant accident in 2011, the Japan Atomic Energy Agency adapted High-Temperature engineering Test Reactor (HTTR) to meet the new regulatory requirements that began in December 2013. The safety and seismic classifications of the existing structures, systems, and components were discussed to reflect insights regarding High Temperature Gas-cooled Reactors (HTGRs) that were acquired through various HTTR safety tests. Structures, systems, and components that are subject to protection have been defined, and countermeasures to manage internal and external hazards that affect safety functions have been strengthened. Additionally, measures are in place to control accidents that may cause large amounts of radioactive material to be released, as a beyond design based accident. The Nuclear Regulatory Commission rigorously and appropriately reviewed this approach for compliance with the new regulatory requirements. After nine amendments, the application to modify the HTTR's installation license that was submitted in November 2014 was approved in June 2020. This response shows that facilities can reasonably be designed to meet the enhanced regulatory requirements, if they reflect the characteristics of HTGRs. We believe that we have established a reference for future development of HTGR.
Futemma, Akira; Sanada, Yukihisa; Ishizaki, Azusa; Kawasaki, Yoshiharu*; Iwai, Takeyuki*; Hiraga, Shogo*; Sato, Kazuhiko*; Haginoya, Masashi*; Matsunaga, Yuki*; Kikuchi, Hikaru*; et al.
JAEA-Technology 2021-029, 132 Pages, 2022/02
By the nuclear disaster of Fukushima Daiichi Nuclear Power Station (FDNPS), Tokyo Electric Power Company (TEPCO), caused by the Great East Japan Earthquake and the following tsunami on March 11, 2011, a large amount of radioactive material was released from the FDNPS. After the nuclear disaster, airborne radiation monitoring using manned helicopter has been conducted around FDNPS. The results of the airborne radiation monitoring and the evaluation for temporal change of dose rate in the fiscal 2020 were summarized in this report. Analysis considering topographical effects was applied to the result of the airborne monitoring to improve the accuracy of conventional method. In addition, technique for discriminating gamma rays from the ground and those from the airborne Rn-progenies was also utilized to evaluate their effect on airborne radiation monitoring.
Saito, Mutsuki*; Takagishi, Ryunosuke*; Kurita, Nubuyuki*; Watanabe, Masari*; Tanaka, Hidekazu*; Nomura, Ryuji*; Fukumoto, Yoshiyuki*; Ikeuchi, Kazuhiko*; Kajimoto, Ryoichi
Physical Review B, 105(6), p.064424_1 - 064424_15, 2022/02
Times Cited Count:5 Percentile:83.2(Materials Science, Multidisciplinary)Futemma, Akira; Sanada, Yukihisa; Sasaki, Miyuki; Kawasaki, Yoshiharu*; Iwai, Takeyuki*; Hiraga, Shogo*; Sato, Kazuhiko*; Haginoya, Masashi*; Matsunaga, Yuki*; Kikuchi, Hikaru*; et al.
JAEA-Technology 2021-020, 138 Pages, 2021/11
A large amount of radioactive material was released by the nuclear disaster of Fukushima Daiichi Nuclear Power Station (FDNPS), Tokyo Electric Power Company, caused by the Great East Japan Earthquake and the following tsunami on March 11, 2011. After the nuclear disaster, airborne radiation monitoring via manned helicopter has been utilized to grasp rapidly and widely the distribution of the radioactive materials surrounding FDNPS. We prepare the data of background radiation dose, geomorphic characteristics and the controlled airspace surrounding nuclear facilities of the whole country in order to make effective use of the monitoring technique as a way of emergency radiation monitoring and supply the results during an accident of a facility. This report is summarized that the knowledge as noted above achieved by the aerial radiation monitoring around Tsuruga and Mihama nuclear power station, research reactors in Kindai University Atomic Energy Research Institute and Institute for Integrated Radiation and Nuclear Science, Kyoto University. In addition, examination's progress aimed at introduction of airborne radiation monitoring via unmanned plane during nuclear disaster and the technical issues are summarized in this report.
Okumura, Takuma*; Azuma, Toshiyuki*; Bennet, D. A.*; Caradonna, P.*; Chiu, I.-H.*; Doriese, W. B.*; Durkin, M. S.*; Fowler, J. W.*; Gard, J. D.*; Hashimoto, Tadashi; et al.
IEEE Transactions on Applied Superconductivity, 31(5), p.2101704_1 - 2101704_4, 2021/08
Times Cited Count:1 Percentile:15.5(Engineering, Electrical & Electronic)A superconducting transition-edge sensor (TES) microcalorimeter is an ideal X-ray detector for experiments at accelerator facilities because of good energy resolution and high efficiency. To study the performance of the TES detector with a high-intensity pulsed charged-particle beam, we measured X-ray spectra with a pulsed muon beam at the Japan Proton Accelerator Research Complex (J-PARC) in Japan. We found substantial temporal shifts of the X-ray energy correlated with the arrival time of the pulsed muon beam, which was reasonably explained by pulse pileup due to the incidence of energetic particles from the initial pulsed beam.
Okumura, Takuma*; Azuma, Toshiyuki*; Bennet, D. A.*; Caradonna, P.*; Chiu, I. H.*; Doriese, W. B.*; Durkin, M. S.*; Fowler, J. W.*; Gard, J. D.*; Hashimoto, Tadashi; et al.
Physical Review Letters, 127(5), p.053001_1 - 053001_7, 2021/07
Times Cited Count:9 Percentile:76.2(Physics, Multidisciplinary)We observed electronic X rays emitted from muonic iron atoms using a superconducting transition-edge-type sensor microcalorimeter. The energy resolution of 5.2 eV in FWHM allowed us to observe the asymmetric broad profile of the electronic characteristic
and
X rays together with the hypersatellite
X rays around 6 keV. This signature reflects the time-dependent screening of the nuclear charge by the negative muon and the
-shell electrons, accompanied by electron side-feeding. Assisted by a simulation, this data clearly reveals the electronic
- and
-shell hole production and their temporal evolution during the muon cascade process.
Sakakibara, Hiroshi; Aoki, Nobuhiro; Muto, Masahiro; Otabe, Jun; Takahashi, Kenji*; Fujita, Naoyuki*; Hiyama, Kazuhiko*; Suzuki, Hirokazu*; Kamogawa, Toshiyuki*; Yokosuka, Toru*; et al.
JAEA-Technology 2020-020, 73 Pages, 2021/03
The decommissioning is currently in progress at the prototype fast breeder reactor Monju. Fuel assemblies will be taken out of its core for the first step of the great task. Fuel assemblies stand on their own spike plugged into a socket on the core support plate and support with adjacent assemblies through their housing pads each other, resulting in steady core structure. For this reason, some substitutive assemblies are necessary for the purpose of discharging the fuel assemblies of the core. Monju side commissioned, therefore, Plutonium Fuel Development Center to manufacture the substitutive assemblies and the Center accepted it. This report gives descriptions of design, manufacture, and shipment in regard to the substitutive assemblies.
Futemma, Akira; Sanada, Yukihisa; Kawasaki, Yoshiharu*; Iwai, Takeyuki*; Hiraga, Shogo*; Sato, Kazuhiko*; Haginoya, Masashi*; Matsunaga, Yuki*; Kikuchi, Hikaru*; Ishizaki, Azusa; et al.
JAEA-Technology 2020-019, 128 Pages, 2021/02
A large amount of radioactive material was released by the nuclear disaster of Fukushima Daiichi Nuclear Power Station (FDNPS), Tokyo Electric Power Company, caused by the Great East Japan Earthquake and the following tsunami on March 11, 2011. After the nuclear disaster, airborne radiation monitoring using manned helicopter has been utilized to grasp rapidly and widely the distribution of the radioactive materials around FDNPS. We prepare the data of background radiation dose, geomorphic characteristics and the controlled airspace around nuclear facilities of the whole country in order to make effective use of the monitoring technique as a way of emergency radiation monitoring and supply the results during accidents of the facilities. Furthermore, the airborne radiation monitoring has been conducted in Integrated Nuclear Emergency Response Drill to increase effectiveness of the monitoring. This report is summarized that the knowledge as noted above achieved by the aerial radiation monitoring around Higashidori nuclear power station, the nuclear fuel reprocessing plant in Rokkasho village and Shika nuclear power station, the full details of the aerial radiation monitoring in Integrated Nuclear Emergency Response Drill in the fiscal 2019. In addition, examination's progress aimed at introduction of airborne radiation monitoring using unmanned helicopter during nuclear disaster and the technical issues are summarized in this report.
Futemma, Akira; Sanada, Yukihisa; Ishizaki, Azusa; Kawasaki, Yoshiharu*; Iwai, Takeyuki*; Hiraga, Shogo*; Sato, Kazuhiko*; Haginoya, Masashi*; Matsunaga, Yuki*; Kikuchi, Hikaru*; et al.
JAEA-Technology 2020-018, 121 Pages, 2021/02
By the nuclear disaster of Fukushima Daiichi Nuclear Power Station (FDNPS), Tokyo Electric Power Company (TEPCO), caused by the Great East Japan Earthquake and the following tsunami on March 11, 2011, a large amount of radioactive material was released from the FDNPS. After the nuclear disaster, airborne radiation monitoring using manned helicopter has been conducted around FDNPS. The results in the fiscal 2019 were summarized in this report. Analysis taken topographical effects into consideration was applied to the result of airborne monitoring to improve the precision of conventional method. In addition, discrimination method of gamma rays from Rn-progenies was also utilized to evaluate their effect on aerial radiation monitoring.
Aoki, Katsunori; Yamanaka, Hiroki*; Watanabe, Kazuhiko*; Sugihara, Kozo
JAEA-Data/Code 2020-018, 45 Pages, 2021/02
Mizunami Underground Research Laboratory (MIU) Project is pursued by Japan Atomic Energy Agency (JAEA) in the crystalline host rock (granite) as a part of geoscientific study of JAEA, and underground facilities of MIU are constructed down to 500m blow the ground surface. As small amount of Uranium is normally contained in granite, high concentration of radon is sometimes detected in the air of the underground facilities constructed in granitic rocks depending on their ventilation conditions. Radon concentrations in underground facilities of MIU have been measured according to the excavation progress of underground facilities or the change of ventilation system. It is recognized that the data obtained by the actual measurement of radon concentration in such underground facilities are rare and valuable. This repot summarizes the measured data from fiscal 2010 to fiscal 2020, together with the information of ventilation conditions and air temperature which affect radon concentrations in underground facilities. The variation of the equilibrium factors of radon is also examined with the actually measured data. As a result, it has been found that radon concentration in the drift is high in summer and low in winter according to the natural ventilation caused by the seasonal temperature difference between in and out of the underground facilities. Furthermore, the temporary increase in the equilibrium factor of radon in the drift at the start of ventilation is supposed to be due to the aerosol increase by the ventilation flow, such as the dust blown up.
Takahashi, Hiroki; Sawabe, Yuki*; Watanabe, Kazuhiko*
Proceedings of 17th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.275 - 279, 2020/09
The amount of monitor value (operation information) tends to increase, because of the increase of accelerator components, or in order to realize the safety and the stable operation. Then, an enormous volume of operation data increases the possibility of occurrence of erroneous operation such as overlooking of monitor value and etc. In order to ensure the safe and stable operation of the J-PARC accelerator, the occurrence of such human error is alarming. Therefore, for the purpose of operation support, we started designing and producing a system that monitors the machine status and detects alarm status from 2017. First, for Linac, we designed and produced a function to detect the alarm status based on the set value. Next, this function was applied to the machine status monitoring system for RCS. In addition, we are designing and developing functions to detect the alarm status based on the reference value or fixed value, for the purpose of detecting setting errors due to human error. In this paper, the current status and future plans of machine status monitoring system for J-PARC RCS are presented.
Matsui, Hiroya; Watanabe, Kazuhiko*; Mikake, Shinichiro; Niimi, Katsuyuki*; Kobayashi, Shinji*; Toguri, Satohito*
Dai-47-Kai Gamban Rikigaku Ni Kansuru Shimpojiumu Koenshu (Internet), p.293 - 298, 2020/01
Japan Atomic Energy Agency has been observed seismic motions induced by earthquakes, at ground surface, galleries at 100m, 300m and 500m depth of Mizunami underground research laboratory for over 10 years. The results suggested that the amplitude of the seismic motion decreases with depth as the previous study on crystalline rock at Kamaishi mine indicated. Detailed analysis on the observed seismic motions shows that the Fourier amplitude and the phase difference of the earthquake occurred near epicenter correspond with the one calculated by one-dimensional multiple reflection theory.
Futemma, Akira; Sanada, Yukihisa; Komiya, Tomokazu; Iwai, Takeyuki*; Seguchi, Eisaku*; Matsunaga, Yuki*; Kawabata, Tomoki*; Haginoya, Masashi*; Hiraga, Shogo*; Sato, Kazuhiko*; et al.
JAEA-Technology 2019-017, 95 Pages, 2019/11
By the nuclear disaster of Fukushima Daiichi Nuclear Power Station (FDNPS), Tokyo Electric Power Company (TEPCO), caused by the Great East Japan Earthquake and the following tsunami on March 11, 2011, a large amount of radioactive material was released from the FDNPS. After the nuclear disaster, airborne radiation monitoring using manned helicopter was conducted around FDNPS. We have carried out the background radiation monitoring around the nuclear power stations of the whole country to apply the airborne radiation monitoring technique that has been cultivated in the aerial monitoring around FDNPS against nuclear emergency response. The results of monitoring around Shimane and Hamaoka Nuclear Power Stations in the fiscal 2018 were summarized in this report. In addition, technical issues were described.
Futemma, Akira; Sanada, Yukihisa; Ishizaki, Azusa; Komiya, Tomokazu; Iwai, Takeyuki*; Seguchi, Eisaku*; Matsunaga, Yuki*; Kawabata, Tomoki*; Haginoya, Masashi*; Hiraga, Shogo*; et al.
JAEA-Technology 2019-016, 116 Pages, 2019/11
By the nuclear disaster of Fukushima Daiichi Nuclear Power Station (FDNPS), Tokyo Electric Power Company (TEPCO), caused by the Great East Japan Earthquake and the following tsunami on March 11, 2011, a large amount of radioactive material was released from the FDNPS. After the nuclear disaster, airborne radiation monitoring using manned helicopter has been conducted around FDNPS. The results in the fiscal 2018 were summarized in this report. Discrimination method of gamma rays from Rn-progenies was also utilized to evaluate their effect on aerial radiation monitoring. In addition, analysis taken topographical effects into consideration was applied to previous results of airborne monitoring to improve the precision of conventional method.
Tonoike, Kotaro; Watanabe, Tomoaki; Gunji, Satoshi; Yamane, Yuichi; Nagaya, Yasunobu; Umeda, Miki; Izawa, Kazuhiko; Ogawa, Kazuhiko
Proceedings of 11th International Conference on Nuclear Criticality Safety (ICNC 2019) (Internet), 9 Pages, 2019/09
Criticality control of the fuel debris in the Fukushima Daiichi Nuclear Power Station would be a risk-informed control to mitigate consequences of criticality events, instead of a deterministic control to prevent such events. The Nuclear Regulation Authority of Japan has administrated a research and development program to tackle this challenge since 2014. The Nuclear Safety Research Center of Japan Atomic Energy Agency, commissioned by the authority, is conducting activities such as computations of criticality characteristics of the fuel debris, development of a criticality analysis code, preparation of criticality experiments, and development of a criticality risk analysis method.
Kikuzawa, Nobuhiro; Niki, Kazuaki*; Yamamoto, Noboru*; Hayashi, Naoki; Adachi, Masatoshi*; Watanabe, Kazuhiko*
Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.877 - 880, 2019/07
Interlock system of J-PARC is classified into a personnel protection system (PPS) for human safety and a machine protection system (MPS) for protecting equipment. The PPS of the J-PARC accelerator started from the operation at Linac in 2006 and was completed by the MR operation in 2008. In the next 10 years, some improvements have been made, such as updating video monitoring systems and establishing new interlocks. In addition to describing recent operations including these updatings, this paper reports the current status of inspections and maintenance conducted to maintain and improve reliability.
Kinsho, Michikazu; Kamiya, Junichiro; Abe, Kazuhiko*; Nakamura, Tomaru*
Proceedings of 10th International Particle Accelerator Conference (IPAC '19) (Internet), p.4161 - 4163, 2019/06
Alumina ceramics vacuum chamber which is used for the 3GeV rapid-cycling synchrotron (RCS) in J-PARC is composed of alumina duct, titanium (Ti) flanges and Ti sleeves. Before brazing the alumina duct and the Ti sleeves, the Ti sleeves were treated with nitric hydrofluoric acid. The purpose of this study is to clear the effect of this treatment for titanium material. It was cleared by SEM observation that the roughness of the titanium material after the nitric hydrofluoric acid treatment becomes big. It was also measured that the thickness of oxide film on surface of the titanium material was 12.7 nm before treatment and 6.0 nm after treatment. It became clear that both the clearing of oxide layer on the alumina ceramics and the vacuum condition of the vacuum heating furnace were important for brazing between alumina ceramics and pure titanium.
Futemma, Akira; Sanada, Yukihisa; Iwai, Takeyuki*; Seguchi, Eisaku; Matsunaga, Yuki*; Kawabata, Tomoki; Toyoda, Masayuki*; Tobita, Shinichiro*; Hiraga, Shogo*; Sato, Kazuhiko*; et al.
JAEA-Technology 2018-016, 98 Pages, 2019/02
By the nuclear disaster of Fukushima Daiichi Nuclear Power Station (FDNPS), Tokyo Electric Power Company (TEPCO), caused by the Great East Japan Earthquake and the following tsunami on March 11, 2011, a large amount of radioactive material was released from the NPS. After the nuclear disaster, airborne radiation monitoring using manned helicopter was conducted around FDNPS. We have carried out the background monitoring around the nuclear power stations of the whole country to apply the airborne radiation monitoring technique that has been cultivated in Fukushima against nuclear emergency response. The results of monitoring around Tomari, Kashiwazaki-Kariwa and Genkai Nuclear Power Station in the fiscal 2017 were summarized in this report. In addition, technical issues were described.